Honeywell V4297A Series Скачать руководство пользователя страница 4

SOLENOID SAFETY SHUT-OFF VALVE

65-0246—1

4

Fig. 7.  Flow curves for V4297A1013 SSOV 

with 1-1/2 in. (38 mm) pipe adapter.

Fig. 8.  Flow curves for V4297A1013 SSOV 

with 2 in. (51 mm) pipe adapter.

Bolt/Nut Fasteners: Small Body:

3/8-16 by 1-3/8, Grade 5 bolt. Metric equivalent: 

M8 by 1.25 by 35 mm, Class 9.8.

Tapping and Plug:
Taps: 1/4 in. NPT taps.Plugs: 1/4 inch hex head.

Ambient Operating Temperature Range: 

-40

°

F (-40

°

C) to +130

°

F (54

°

C).

Valve Body Material: Aluminum.

Mounting: Directly bolted to Integrated Valve Train 

components.

Mounting Position: Vertical to 90 degrees from vertical. 

See Fig. 9.

Fig. 9. Mounting positions for V4297A 

Solenoid Shut-off Safety Valve.

Electrical Terminations: Screw terminal connections.

Current Draw:
V4297A1005 small capacity, 120V: 0.2A.
V4297A1013 high capacity, 120V: 0.5A.

Valve Opening Time:  < 1 sec.

Valve Closing Time:  < 1 sec.

Dimensions: See Fig. 10 and 11.

Weight:
V4297A1005: 8 lb (3.6 kg)
V4297A1013: 14 lb (6.3 kg)

Replacement Parts:
BBA51315 Coil for V4297A1005.
BBA51318 Coil for V4297A1013.

Accessories:
Pipe Adapters:

32000109-001 3/4 in. NPT.
32000109-002 1 in. NPT.
32000109-003 1-1/4 in. NPT.
32000109-004 1-1/2 in. NPT.
32000109-005 2 in. NPT.

KTCPI001 Visual Position Indicator.
4074EYF Bag Assembly (bolts, nuts and washers), supplied.
4074EYK Bag Assembly (O-rings and tube of lubricant), 

supplied.

100

100

1,000

10,000

30,000

10

1

0.1

PRESSURE DR

OP (IN.

 WC)

FLOW CAPACITY (cfh)

M16538

Propane, sp. gr = 1.53.
Natural Gas, sp. gr = 0.64.

LEGEND:

100

100

1,000

10,000

30,000

10

1

0.1

PRESSURE DR

OP (IN.

 WC)

FLOW CAPACITY (cfh)

Propane, sp. gr = 1.53.
Natural Gas, sp. gr = 0.64.

LEGEND:

M16539

M16462

Содержание V4297A Series

Страница 1: ...alve body small applicable to five pipe sizes 3 4 in 19 mm 1 in 25 mm 1 1 4 in 32 mm 1 1 2 in 38 mm and 2 in 51 mm pipes Two valves with different capacities V4297A1005 1 in 25 mm internal opening small capacity V4297A1013 2 in 51 mm internal opening high capacity Two 1 4 in NPT upstream and one 1 4 in NPT downstream pressure taps and plugs Accepts C6097 Pressure Switch mounted directly to flange ...

Страница 2: ...s listed Also this product is tested and calibrated under closely controlled conditions and some minor differences in performance can be expected if those conditions are changed Models V4297A1005 small body 1 in 25 mm internal opening small capacity V4297A1013 small body 2 in 51 mm internal opening high capacity Types of Gas Natural manufactured mixed or LP only Gas Train Pipe Size 3 4 in 19 mm 1 ...

Страница 3: ...00 100 1 000 10 000 30 000 10 1 0 1 PRESSURE DROP IN WC FLOW CAPACITY cfh M16534 Propane sp gr 1 53 Natural Gas sp gr 0 64 LEGEND 100 100 1 000 10 000 30 000 10 1 0 1 PRESSURE DROP IN WC FLOW CAPACITY cfh M16535 Propane sp gr 1 53 Natural Gas sp gr 0 64 LEGEND 100 100 1 000 10 000 30 000 10 1 0 1 PRESSURE DROP IN WC FLOW CAPACITY cfh M16536 Propane sp gr 1 53 Natural Gas sp gr 0 64 LEGEND 100 100 ...

Страница 4: ...al connections Current Draw V4297A1005 small capacity 120V 0 2A V4297A1013 high capacity 120V 0 5A Valve Opening Time 1 sec Valve Closing Time 1 sec Dimensions See Fig 10 and 11 Weight V4297A1005 8 lb 3 6 kg V4297A1013 14 lb 6 3 kg Replacement Parts BBA51315 Coil for V4297A1005 BBA51318 Coil for V4297A1013 Accessories Pipe Adapters 32000109 001 3 4 in NPT 32000109 002 1 in NPT 32000109 003 1 1 4 i...

Страница 5: ...esign Certified Factory Mutual FM Approved KTCPI001 Visual Position Indicator required if used with pipe size larger than 3 4 in NOTE NOTE Some application codes such as NFPA require visual indication of the valve position as provided by the KTCPI001 Visual Position Indicator 2 51 5 127 5 1 2 140 5 5 8 143 2 1 2 64 1 1 2 38 2 51 2 3 4 70 1 2 13 5 3 4 147 5 5 8 143 9 229 M16541 TOP VIEW 2 51 5 127 ...

Страница 6: ...uctions on mounting a V4297A in a Honeywell Integrated Valve Train System Refer to the installation instructions packed with the Honeywell KTCPI001 Visual Position Indicator for mounting instructions of the indicator WIRING 1 Make sure all wiring agrees with all applicable local codes ordinances and regulations An opening is provided to accommodate rigid conduit or armored cable for line voltage o...

Страница 7: ...gas cock A 7 Run the V4297A Valve to is open position through the safety system then immediately de energize the system to close the V4297A Valve 8 Immerse a 1 4 in 6 mm tube vertically 1 2 in 13 mm into a jar of water 9 Slowly open the manual test petcock F 10 When the rate of bubbles coming through the water stabilizes count the number of bubbles appearing during a ten second period Each bubble ...

Страница 8: ... terminal block make sure all appropriate contacts in the thermostat or controller limits and flame safeguard controls are closed If one or more are open determine the cause s correct the trouble and proceed 4 If there is proper voltage at the valve but the valve still does not open check for normal gas pressure 5 If the valve still does not open replace the valve If the valve does not close when ...

Отзывы: