background image

S-326.1-ALI50EN-ENG   A. 1   05-2015  

    

 

 

 

 

 

  

                                 Page 4 of 7 

 
 
 
 
 
 
 

3)  Insert the belt in the central “screw in tie mounts”. Do the same thing on the right side. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

4)  Place the battery and then fix the belt. Do the same thing on the right side. 
 

 

 

 
 
 
 
 
 
 
 
 
 
 
 

Содержание NOTIFIER ALI50EN

Страница 1: ...e test will be carried out every 10 minutes whilst in case it is not connected it will continue carry out the test every 20 seconds showing indication FAILURE During normal operation the battery efficiency is checked by controlling the batteries voltage If batteries do not manage to maintain an acceptable voltage during test there will be the indication FAILURE A test of the battery internal resis...

Страница 2: ...cerning power supplies CEI 64 8 INSTALLATION Mechanical mounting This device has to be mounted on vertical stable walls suitable to support the power supply by means of 4 screws with 6mm diameter for spacers and screws on the 4 holes on the bottom of the box The battery must be fixed using the strap given within ELECTRICAL SPECIFICATIONS Supplying Voltage 230 Vac 10 15 Ac mains frequency 50 Hz sin...

Страница 3: ...age 3 of 7 1 Rotate the screw in tie mounts in vertical position and insert the tie Do the same thing on the right side 2 Rotate the screw in tie mounts in horizontal position Do the same thing on the right side SCREW IN TIE MOUNTS TIE ...

Страница 4: ...6 1 ALI50EN ENG A 1 05 2015 Page 4 of 7 3 Insert the belt in the central screw in tie mounts Do the same thing on the right side 4 Place the battery and then fix the belt Do the same thing on the right side ...

Страница 5: ...nection N connection to neutral Checks and Adjustments Control is shown below VRES1 is adjusted at factory and Tampering of this control automatically means the lost of the warranty must not be altered by the operator VRES1 Potentiometer for adjustment of the output Voltage INDICATION ON THE FRONT PANEL located on the door of the power supply Standard visualization Alternate visualization Pushing ...

Страница 6: ...servicing must be carried out by qualified personnel in order to prevent the possibility of a malfunctioning of the power supply It is recommended to carry out servicing every 6 months and to evaluate control panel of the system in order to check possible alarms during tests Check the connections of the 230 Vac supplying lines Check the connections of the alarm indication lines and related shields...

Страница 7: ...ier s r l Via A Grandi 22 20097 S Donato Milanese MI 15 Dop N 1293 CPR 0483 EN 54 4 1997 A2 2006 AC 1999 Power supply equipment for fire detection and fire alarm systems for buildings ALI50EN Wasting This product must be wasted in appropriate wheelie bin for electric and electronic materials Do not put in wheelie bin for other kind of waste Fig 3 FUSE1 Fuse of the 230 Vac mains not replaceable F1 ...

Отзывы: