U s e r I n s t r u c t i o n s - E n g l i s h
7
Step 1
Wrap a cross-arm strap around
each approved anchorage point for the
system installation. To prevent slippage,
wrap cross-arm strap around anchorage
point as many times as possible.
D-ring
must pass completely through loop.
Step 2
Secure snap hook (on
shock absorber lifeline end)
and carabiner (on opposite
lifeline end) to D-rings on
cross-arm straps. Be sure
snap hook and carabiner
are properly connected--
closed and locked--and no
gate loading is present.
Step 4
Tension the line with wrench or bar
E\SXOOLQJ¿UPO\RQWKHIUHHHQGRIWKH
rope while at the same time turning the
tensioner nut in the direction of the ar-
row. Tighten nut (1-3/16”) until tensioner
begins to slip against the rope.
Once
slippage occurs, DO NOT continue to
tighten the tensioner.
Step 3
Remove slack in system by releasing the
tension release lever and pull the free
end of the rope through the tensioner.
Step 5
Close the tension release lever to prevent
unintentional loosening of line tension.
Assembly and Installation
)RUXVHFRQQHFWRQO\WRRQHRIWKH2ULQJV
provided on the horizontal lifeline.
'2127FRQQHFWWRERWK2ULQJVZLWKRQHFRQQHFWLQJGHYLFH
'2127FRQQHFWPRUHWKDQRQHFRQQHFWLQJGHYLFHWRDVLQJOH2ULQJ
Use only connecting devices with compatible locking snap hooks,
auto-locking carabiners, or other Honeywell-approved connectors.
Содержание Miller Techline HLLR Series
Страница 1: ...I254 Rev D MFP9720128 22 April 2013 ...