
Dual Node Module Service
Index-2
9/95
Index
Topic
Section Heading
Power On Test
3.2.1
Power Supply/Fan Troubleshooting
3.3.1
Power Supply Loading in LCNE2 Host Node
2.11, Table 2-4
Power Supply Replacement
2.9
Precision Clock Pinning
2.9
Quality Logic Test
3.2.3
Rear Panel Assembly
2.5
Rear View, Two Dual Node Modules
2.2, Figure 2-2
Related Publications
1.2
Reset Test
3.2.2
SIO Board, Troubleshooting
3.3.2
Spare Parts
Introduction
5.1
SPC Board, Troubleshooting
3.3.2
Startup
Visual Checks
6.1
Initialize Module
6.2
TDC 3000X Module Functions
2.1, Figure 2-1
Testing Flow Diagram
3.2, Figure 3-1
Test/Troubleshooting
3
Tests
3.1
Test Procedures
Power Up Test
3.2.1
Reset Test
3.2.2
Troubleshooting
Power Supply/Fan
3.3.1
Controller Boards
3.3.2
PLCI Board
3.3.3
Processor Board (K2LCN
3.3.4
EPDG Board
3.3.5
EPNI Board
3.3.6
Fiber Optic Extender Board (LCNE2)
3.3.7
RS-485 to LCN Converter Boards (KLCNA, KLCNB)
3.3.8
NGI Board
3.3.9
Universal Station Configuration
2.3, Tables 2-2, 2-3
Universal Station with Floppy Drives Configuration
2.3, Table 2-3
Universal Station with Trend Pen Configuration
2.3, Table 2-3
Содержание LC13-510
Страница 1: ...L Dual Node Module Service LC13 510 ...
Страница 2: ......
Страница 3: ...L LCN Service 2 Dual Node Module Service LC13 510 Release 500 CE Compliant 9 95 ...
Страница 10: ...Dual Node Module Service 1 2 9 95 ...
Страница 50: ...Dual Node Module Service 3 14 9 95 ...
Страница 58: ...Dual Node Module Service 6 2 9 95 ...
Страница 75: ......