
Dual Node Module Service
2-26
9/95
2.11
2.11 POWER SUPPLY LOADING IN LCNE/LCNE2 HOST NODE
The LCN may be extended with one or more Fiber Optic Links. An otherwise empty node
of a Dual Node Module may be used to host the LCNE/LCNE2 fiber optic transmit/receive
boards. However, the LCNE/LCNE2 boards alone do not provide adequate load on the
power supply to ensure that it will perform to specifications. A version of the KJMP board
(51401594-200) with power supply loading resistors is used in this situation. Table 2-4
illustrates this configuration. The table indicates that more than one LCNE/LCNE2 could
be installed in a node. While this is physically possible, system convention is to place the
LCNE/LCNE2s on separate power supplies to prevent the loss of both Cable A and Cable
B at the remote segment of the LCN if a power supply fails. If both nodes of a Dual Node
Module are empty, each node could be used to host one of the two required
LCNE/LCNE2s, because each node has a separate power supply.
NOTE
The LCNE2 board is a later revision of the LCNE board. They are functionally equivalent and
your system may include either or both types.
Table 2-4— LCNE/LCNE2 Host Nodes
Lower Node
Upper Node
Slot
Front
Rear
Slot
Front
Rear
3
Note
2
KJMP
Note
2
KJMP
Note
1
LCNE/LCNE2
1
LCNE/LCNE2
Note: May be LCNE/LCNE2, FOC/XMTR, FOC/RCVR or empty.
CAUTION
Do not place a CS/R board in I/O Slot 1 of either node or serious damage can result.
Содержание LC13-510
Страница 1: ...L Dual Node Module Service LC13 510 ...
Страница 2: ......
Страница 3: ...L LCN Service 2 Dual Node Module Service LC13 510 Release 500 CE Compliant 9 95 ...
Страница 10: ...Dual Node Module Service 1 2 9 95 ...
Страница 50: ...Dual Node Module Service 3 14 9 95 ...
Страница 58: ...Dual Node Module Service 6 2 9 95 ...
Страница 75: ......