ULTRAVIOLET SYSTEM
5
69-1859EFS—04
Fig. 4. Ultraviolet System template.
4.
Use a 3/32 in. drill to provide pilot holes for the
mounting screws.
5.
Be sure the duct surface is flat after all holes are
drilled.
6.
Position the entire base unit on the duct. Be sure the
bulb holes in the duct align with those in the unit to
allow bulb insertion.
7.
Install the unit on to the duct using the two no.10, 2
in. Phillips head sheet metal mounting screws pro-
vided.
8.
Tighten the screws so the space between the case
and duct is sealed.
M18991
CENTER OF 2 IN. (51 MM)
HOLE FOR LAMP
3/32 IN. (3 MM) PILOT HOLES
FOR MOUNTING SCREWS
ALIGN EITHER OF THESE LINES
AS CLOSE AS POSSIBLE TO
DUCT CENTER LINE
Содержание UV100A 1059
Страница 31: ...SISTEMA ULTRAVIOLETA 11 69 1859EFS 04 ...