8-5
dummyhead
dummyhead
WB20XT2•WB30XT2
IGNITION SYSTEM
INSTALLATION
• Clean the tapered parts (1) of dirt, oil, grease, and
other foreign material before installation.
• Be sure there are no metal parts or other foreign
material on the magnet part (2) of the flywheel.
Set the woodruff key (3) in the key groove (4) of the
crankshaft securely.
Set the flywheel (5) by aligning the key slot (6) with the
woodruff key on the crankshaft.
Attach the cooling fan (1) to the flywheel (2) by aligning
the four projections of the cooling fan with the holes of
the flywheel.
Attach the starter pulley (3) by aligning the following:
– Holes of the pulley and tabs of the cooling fan
– Tab of the pulley and hole of the flywheel
Apply a light coat of oil to the threads and the seating
surface of the nut (1) and loosely tighten the nut.
Hold the flywheel (2) with a commercially available
strap wrench (3), being careful not to damage the
magnet part.
Tighten the flywheel nut to the specified torque.
(4)
(3)
(6)
(2)
(5)
(1)
(3)
(2)
Align
Align
Align
(1)
TORQUE: 75 N·m (7.6 kgf·m, 55 lbf·ft)
(2)
(3)
(1)
Содержание WB20XT2
Страница 15: ...MEMO dummyhead dummyhead...
Страница 47: ...MEMO dummyhead dummyhead...
Страница 48: ...5 1 5 dummytext 5 COVER FAN COVER REMOVAL INSTALLATION 5 2...
Страница 95: ...MEMO dummyhead dummyhead...
Страница 96: ...11 1 11 dummytext 11 ENGINE REMOVAL INSTALLATION ENGINE REMOVAL INSTALLATION 11 2...
Страница 99: ...MEMO dummyhead dummyhead...
Страница 111: ...MEMO dummyhead dummyhead...
Страница 126: ...14 1 14 dummytext 14 MUFFLER MUFFLER REMOVAL INSTALLATION 14 2 EXHAUST PIPE STUD BOLT REPLACEMENT 14 3...
Страница 129: ...MEMO dummyhead dummyhead...
Страница 130: ...15 1 15 dummytext 15 WIRING DIAGRAM WIRING DIAGRAM 15 2...