
8
INSTALLATION INSTRUCTIONS
BEFORE YOU BEGIN
PREPARE AIR CONDITIONER
INSTALL THE ACCORDION PANELS
Lower sash must open sufficiently to allow a clear
vertical opening of 13 inches. Side louvers and the rear
of the AC must have clear air space to allow enough
airflow through the condenser, for heat removal. The
rear of the unit must be outdoors, not inside a building
or garage.
A: Remove the air conditioner from the carton and
place on a flat surface.
B: Remove top rail from the rear of the packaging
material as shown in Fig. A.
NOTE: Top rail and Sliding Panels at each side are offset
to provide the proper pitch to the rear of (5/16). This
is necessary for proper condensed water utilization
and drainage. If you are not using the Side Panels for
any reason, this pitch to the rear must be maintained.
C: Align the hole in the top rail with those in the top of
the unit as shown in Fig. B.
D: Secure the top rail to the unit with the 3/8” Screws
as shown in Fig. C.
A. Place unit on floor, a
bench or a table. Hold
the Accordion Panel in
one hand and gently pull
back the center to free
the open end. See Fig.1
NOTE: For safety reasons, all four(4) screws MUST be
securely fastened.
CAUTION
1
2
3
Top Rail Hardware
Mounting Hardware
Fig. A
or
3/8” Screws (x4)
Top Rail (x1)
Top Rail
Top Rail
Fig. B
Fig. C
Fig. 1
3/4” (or 1/2”)
Screws
(x7)
Lock Frame
(x2)
Sash Lock
(x1)
Sash Lock
(x1)