Page 4
PARTS INCLUDED FOR ASSEMBLY (parts are not to scale):
1 Finial (#6) 1 Metal Ring (#1) 1 Bottom Holder (#5) 2 Cap Nut (#7)
ASSEMBLY INSTRUCTIONS:
1. Shut off power at the fuse box or circuit breaker box, if necessary remove old
fixture and all mounting hardware from outlet box.
2.
Carefully unpack your new fixture and lay out all the parts on a clear area, Take
care not to lose any small parts necessary for installation.
3.
Install light bulbs in accordance with the fixtures specifications. (DO NOT
EXCEED THE MAXIMUM WATTAGE RATING!!)
4.
Put the Metal Ring (#1), Glass Shade (#4), Bottom Holder (#5) over the bulb
cluster and screw the Finial (6) with nipple into the Extended Nut (#3).
Содержание 23422
Страница 23: ...Page 23 INSTALLATION ...