ASSEMBLY
HOLZMANN MASCHINEN GmbH www.holzmann-maschinen.at
14
SKM 470S
13
ASSEMBLY
13.1
Unpacking
Check for shipping damage. If damage has occurred, a claim must be filed with carrier. Check for
completeness. Immediately report missing parts to dealer.
The rotary machine comes assembled as one unit with one die set attached. Additional parts
which need to be fastened to the tool should be located and accounted for before assembling:
IMPORTANT:
Rotary machine and dies are coated with a protectant. To ensure proper fit and
operation, remove coating. Coating is easily removed with mild solvents, such as mineral spirits,
and a soft cloth. Avoid getting cleaning solution on paint or any of the rubber or plastic parts.
Solvents may deteriorate these finishes. Use soap and water on paint, plastic or rubber
components. After cleaning, cover all exposed surfaces with a light coating of oil.
14
OPERATION
14.1
Installation
Machine should be installed on a level surface, with proper lighting. Machine is to be bench
mounted. Be sure to provide clearance for crank arm rotation. Area around machine should be
clear of scraps, oil or dirt. Apply a suitable non-skid material to floor.
14.2
Operation
Be sure to keep hands clear of forming dies when rotating crank handle. Below is an equivalency
chart for use when working with materials other than mild steel.
Figure 3
–
Profiles of Roll Dies included with Rotary Machine
1. Select the die set required for the operation to be performed.
2. Place spacers , dies and retaining nuts onto the driving and driven shafts. Tighten the retaining
nuts with wrench provided.
3. Adjust the position of the upper die according to thickness of the workpiece ,
4. Insert metal between dies and slowly rotate the crank arm. Check the workpiece. It may be
necessary to fine tune the adjustments made in steps 3 and 4. Repeat steps 3 and 4 until the
correct form is obtained.