Operating Instructions
153 146
197
C 9.92
Maintenance every 250 service hours
Checking the heating system for proper
operation
-
Refer to page 125.
Checking the air conditioner for proper
operation
-
Refer to the operating instructions for the air conditioner.
Checking the sight glass of the air condi-
tioner for the formation of bubbles
-
Refer to the operating instructions for the air conditio-
ner.
-
Check the air conditioner for proper operation.
-
Observe the sight glass (1) during operation. In case
of formation of bubbles, an air conditioning expert
must bleed the unit.
Bild_S 990_041
1
Содержание C 9.92 H
Страница 1: ...Date of Issue 10 09 2009 Order No 153 146 OperatingInstructions C 9 92 H...
Страница 2: ......
Страница 6: ......
Страница 17: ...Operating Instructions 153 146 15 C 9 92 Technical data Tractor dimensions Dimensional drawing...
Страница 46: ......
Страница 60: ......
Страница 118: ......
Страница 138: ......
Страница 142: ......
Страница 144: ......
Страница 162: ......
Страница 208: ......
Страница 210: ......
Страница 214: ......
Страница 218: ......
Страница 222: ......