Operating Instructions
153 146
167
C 9.92
Maintenance during the initial period
of operation
The following services and inspections are due during the
initial period of operation:
Maintenance after the first 50 service hours
Maintenance after the first 500 service hours
Maintenance after the first 50 service
hours
Checking the engine for leaks
-
Raise the dumping subframe (dump body*) and
secure it against accidental lowering.
-
Check the engine and attachments for leaks.
Checking air tubes and air hoses for leaks
-
Check the air tubes and air hoses (1) for damage and
leaks.
Bild_S 990_033
1
* Option
Содержание C 9.92 H
Страница 1: ...Date of Issue 10 09 2009 Order No 153 146 OperatingInstructions C 9 92 H...
Страница 2: ......
Страница 6: ......
Страница 17: ...Operating Instructions 153 146 15 C 9 92 Technical data Tractor dimensions Dimensional drawing...
Страница 46: ......
Страница 60: ......
Страница 118: ......
Страница 138: ......
Страница 142: ......
Страница 144: ......
Страница 162: ......
Страница 208: ......
Страница 210: ......
Страница 214: ......
Страница 218: ......
Страница 222: ......