background image

10

Insert  3 Hexagon Bolts M
6 x16

Step 17: Assembly of Lateral Supports #2.0:
If you bought the optional shelving (shelving without
legs - specially designed for the RIGA greenhouses) -
refer to page 13 for further instuctions

.

If not: Lay 2 of the Lateral Supports (#2.0) on top of the Front
and Back Crossbars one on each side against the Curved
Profiles, attach to the Curved Profiles using the lowest
Hexagon Bolts you put in the Curved Profile channels, tighten
with nuts. Attach in such a manner that the L-shape goes
upwards. If you were to install their shelving later the shelf
trays will lie inside the L.
Install the second set of Lateral Supports (#2.0) about halfway
between the bottom Lateral Supports and the Roof Beam -
stay underneath the Roof Window as shown in the drawing on
page 3.

Roof Window Assembly:  see Page 12
Rear Window Assembly:  see Page 13
Front Door Assembly:  see page 14

Mounting of a Foundation Frame:

If you have purchased the RIGA Foundation Frame (extra high 6“),
you have 2 choices about when to attach it:
(But in either case you must slide 3 Hexagon Bolts  (M 6X16) into
the central channel of each Foundation Frame piece: Place one
bolt near the center and one at each end.)
Choice #1: At the beginning: Mount the Foundation Frame by
hooking it into the floor profiles #1.1 and #1.2 before you start to
assemble the RIGA greenhouse. (Many prefer this method).
Special L-brackets have been provided for you to do it this way.
You slide a Hexagon Bolt into the center channel, towards the
middle of each of the 4 Foundation Frame sections and use a L-
Bracket to hook over the Floor Profile and then over the bolts in
the Foundation Frame - hold in place with a nut. You can remove
these brackets if you wish when you have fully assembled the
greenhouse.
Choice #2. When the greenhouse frame has been completed:
You attach/hook the Foundation Frame (see picture on the left) in
single parts to the 4 Floor Profiles (remember to add 3 Hexagon
Bolts to each piece first). You will have to lift each side of the
greenhouse approx. 10-12“ above the ground. Suggestion: Place
some blocks underneath the frame to hold it up or you can lay it
on its side (yes, if you have properly assembled your greenhouse
you can lay it on its side - and this is a good test to find out!)
Either method, once the 4 Foundation Frame pieces have been
put into place you attach the 4 Corner Brackets (see picture on
the left).

A ngle Brack ets
on the Foundation Frame

Stones to lay
horiz ontally

ca

 6

 -

 1

0

 c

m

Содержание Riga 2 S/2

Страница 1: ... M I N U M O n io n s h a p e d g r e e n h o u s e R ig a Assembly Instructions R IG A S eries II III IV November 2004 Riga Ty p e 3 Tec h n ic a lIn forma tion S u bjec t to C h a n g e M a d e in G erma n y ...

Страница 2: ...t of the U nited States H igh intensity sunshine is not good for more than a few hours a day In such areas some protection from trees and or buildings is recommended Shade cloth might also be needed ask your supplier for details F or greenhouses intended for grow ing vegetables such as tomatoes cucumbers and melons w e recommend the greenhouse be located in a north south direction and for those to...

Страница 3: ...ps head Screwdriver for recessed head screws siz e 2 1 pc O pen jaw wrench 10 mm 0 4 1 pc Screwdriver for slotted screws 1 pc W ater level 1 pc Step L adder approx 6 feet high 1 pc File to remove possible sharp edges 1 pc Rubber Mallet 1 pc Measuring Tape 1 pc E lectric or Cordless D rill 1 pc Bungee Cord 1 pc Caulking Gun IN D E X Part L ist Pages 4 5 Main Frame Assembly Pages 6 11 Foundation Fra...

Страница 4: ...rossbar 2x 1 8 Roof Window Crossbar RIGA IV IV s 2x 1x 1 9 Rear Wall Middle Crossbar 1x 2 0 Lateral Supports 4x 2 1 Curved Corner Profiles with 1 channel 4x Detail A Floor Profile page 7 Detail B Front Crossbar Connection page 8 Detail C Window Door Hinge page 16 Detail D Window Door Frame connection page6 Detail E Roof Beam Connection page 7 2 2 Curved Center Profiles with 2 channels II 2x III 4x...

Страница 5: ...4 6 6 1 2 1 1 1 1 1 1 2 2 4 4 12 12 8 8 1 1 16 16 6 6 1 1 24 24 4 4 21 feet 27 feet 1 1 1 1 1 1 6 6 3 3 24 feet 24 feet M6 M6 x 30 30 x 10 x 4 60 x 27 2 x7 4 40 x 40 x 4 50 x 50 x 5 95 Ø 35 x M6 40 x 30 x 30 4 2 x 13 4 8 x 45 Ø 10 3 5 x 16 4 8 x 25 4 8 x 50 M6 x 20 M6 3 5 x 38 2mm 3 5 mm 6 8 mm 8 50 50 1 8 8 4 6 1 1 1 1 2 4 12 8 1 16 6 1 24 4 21 feet 1 1 1 6 3 24 feet 24 feet 15 feet wedge seal fi...

Страница 6: ...their holes using sheet metal screws 3 5 x 13 once the front glazing panels have been installed Important Slide 1 hexagon bolt M6 x 16 down each door profile channel See Illustration 2 on left These are for the assembly of the Door Frame Cross bars at the top III 2 M6 x 16 v ie w fr o m th e fr o n t holes for sheet m etal screw 3 5 x13 Step 2 Rear Window Frame Assembly Repeat everything in Step 1...

Страница 7: ... on a stepladder Step 9 Adding additional Curved Center Profiles 2 2 Now add more Curved Center Profiles as necessary Series II uses only 1 on each side III uses 2 on each side and IV uses 3 on each side Slide each along the Side Floor Profile as well as the Roof Beam at the same time Be careful to move the profile only inches at a time on each end Preferably one person pushes at the bottom while ...

Страница 8: ...ther side of the greenhouse Once completed you have installed one section of Glazing Panel on each side Step 11 Placing the Roof Window s In order to continue placing the Roof Glazing Panels you must decide on which side you want your Roof Window s This might depend on the prevailing wind It is best not to put Roof Windows facing a prevailing wind but put them on the otherside of the greenhouse Ho...

Страница 9: ...an set the Front Crossbars 1 4 on top of the bottom Glazing Panels Then place on top of each Crossbar a Glazing Panel with the curved edges making sure the side with the UV filter in facing outwards as always Now permanently attach the Crossbars to the outersupports Curved Corner Profiles and Door Frame using screws 4 8 x 45mm 0 2 x 1 75 See picture on the left Next insert the small triangular Gla...

Страница 10: ...iece Place one bolt near the center and one at each end Choice 1 At the beginning Mount the Foundation Frame by hooking it into the floor profiles 1 1 and 1 2 before you start to assemble the RIGA greenhouse Many prefer this method Special L brackets have been provided for you to do it this way You slide a Hexagon Bolt into the center channel towards the middle of each of the 4 Foundation Frame se...

Страница 11: ...he greenhouse on top of a deck concrete slab or a specially build low wall just to add 6 more of head room Attach either the Foundation Frame or Floor Profiles to your foundation using appropriate screws or bolts Recommendation Place at least 1 screw bolt every 3 feet diameter 0 3 0 4 Notice There are no pre drilled holes in either the Floor Profiles or the Foundation Frame for mounting to a hard ...

Страница 12: ... to insert 2 Hexagon Bolts M 6x16 into one of the Skylight profiles 5 0 This one will become the bottom of the window as these will be later used to attach the Automatic Window Opener Attention In order for the window to be able to close correctly you must make sure that the 2 ends with a slight cut out of each of the vertical side profiles are facing to the top Look carefully at each end and put ...

Страница 13: ... corner connector 1 2 x 1 2 x 0 4 4 4 2 Vertical Window Support without holes 50 7 4 3 Horizontal Window Frame Supports 30 1 2 4 4 Vertical Window Support with holes for hinges 50 7 1 Y seal 15 feet Part of the Total Parts List Pos 4 2 Pos 4 4 Mounting of the skylight roof window Slide the narrow circular channel sticking out of the top Skylight Profile 5 0 of the fully assembled roof window see I...

Страница 14: ...ts After they are lined up the profiles are screwed together with the screws going through the screw channels in the Top Crossbar 2 1 Use the sheet metal screw 3 5 x 32 0 15 x 1 25 See Picture Next place the large Lower Crossbeam 4 wide with doorhandle hole 2 4 and screw it together with the sheet metal screws 4 8 x 50 0 2 x 2 Two screws each go on both sides as shown Lower Door Section See Ill 2 ...

Страница 15: ...l on the outside of the profiles with the lip pointing to the inside See illustration at bottom of last page and above Next Insert the Glazing Panels into both door sections on the inside and push in place the GHD seal as shown on the left Ill 1 on this page Door glazing door rung Seal 2 mm Door Handle Assembly Instructions Ill 1 Ill 2 ...

Страница 16: ...tal bracket with the treaded pin sticking up to the Rear Wall Crossbar under the window to the Hexagon Bolt placed there earlier By trial and error determine the optimal position you desire for both ends of the Manual Window Opener Hold the window in a fixed open position by placing any eye in the handle bar over the pin sticking up from the Crossbar below the window and holding it in place with t...

Страница 17: ... screws 3 5x19 Hold the parts is place mark the screw locations with a pen and then drill your own holes Inserting the Rubber Seals 1 On the inside Wedge the narrower seal 3 5 mm as shown pull apart if necessary between the Front Back Wall Glazing Panels and the Floor Profiles see illustration on left This should require little or no strength just push it in place with 2 or 3 fingers 2 On the insi...

Страница 18: ...l Supports against the wall of the greenhouse as you have Curved Profiles i e RIGA III has 4 Curved Profiles on each side Attach to each bolt the longer flat end 1 25 of the Cross Struts about 16 long and secure with nuts Next Bend the cross struts to a horizontal position Ill 2 Then Slide into the bottom and side channels of another Lateral Support similar to the one already fixed into the wall o...

Страница 19: ...teral Support which is placed against the greenhouse side wall as you have Cross struts You should have received an extra cross strut for each glazing section place half way between Curved Profiles Insert the same amount of bolts on the bottom channel of the other Lateral Support In addition slide as many Hexagon Bolts as you have chains hanging down into the channel on the front side of the secon...

Страница 20: ... 3 Your RIGA greenhouse should be ventilated as much as possible especially when condensation develops However high humidity is preferred by some plants and especially during the seed to seedling stage Have lots of fun and success with your RIGA greenhouse from Hoklartherm enjoy the fruits of your labor Please contact your supplier for information about Special Accessories for your RIGA greenhouse...