Service manual
7. Installation details
7.1
Wrench torque sheet for installation
Outside diameter
Torque
mm
inch
Kg.m
φ
6.35
1/4
1.8
φ
9.52
3/8
4.2
φ
12.7
1/2
5.5
7.2
Connecting the cables
The power cord of connect should be selected according to the following specifications sheet.
Grade
Unit
263
353
503
mm
2
1.0 1.
5
2
.5
7.3
Pipe length and the elevation
Pipe size
Capacity
Btu/h
GAS LIQUID
Standard
length
(m)
Max.
Elevation
B (m)
Max.
Pipe
length
A (m)
Additional
refrigerant
(g/m)
263
3/8’’
(
φ
9.52) 1/4’’
(
φ
6.35)
5
5
2
0
30
353-503
1/2’’
(
φ
12.7) 1/4’’
(
φ
6.35)
5
8-10
2
0
-25
30
In case that
more than
Caution:
Capacity is base on standard length and maximum allowance length is base of reliability.
Oil trap should be install per 5-7 meters.
11
Содержание HKEI-HCNI 263 G
Страница 1: ...Cover HKEI HCNI 263 G HKEI HCNI 353 G HKEI HCNI 503 G HOKKAIDO SERVICE MANUAL ...
Страница 10: ...Service manual 4 Refrigerant cycle diagram Cooling only Heat pump mode 7 ...
Страница 12: ...Service manual 6 Wiring diagram HKEI HCNI 263 353 503 G Indoor Outdoor 9 ...
Страница 13: ...Service manual 10 ...