Section 4 - General Maintenance
Step 3:
Check paint flow at the primary filter.
• Place a bucket below the primary paint filter
below the paint deck.
• Slowly open the drain valve and check for flow.
• If paint flow is good, the clog is between the
primary and secondary filters. Close the drain
valve and proceed to step 4.
• If there is little or no flow, the clog is at the
tank valve or between the paint tank and pri-
mary filter or at the primary filter.
•
Follow the Cleaning Paint Filters procedure to
clean the primary filter.
• Check the filter again for flow. If there is still
little or no flow, the clog is between the paint
tank and primary filter. Close the drain valve
and proceed to Step 5.
Step 4:
• Close the inflow and outflow valves on the
primary filter.
• Starting at the primary filter outflow valve,
begin removing tubing sections between the
primary and secondary filters.
•
Remove only one section of tubing at a time,
clean it and flush it thoroughly with water and
then reinstall it. Repeat this process until the
clogged section is found.
NOTICE:
NEVER REMOVE MORE THAN ONE SECTION AT A TIME. THIS
ENSURES THAT YOU GET EACH SECTION BACK INTO THE
POSITION IT BELONGS IN. REMOVING MULTIPLE SECTIONS
AT A TIME WILL CAUSE SIGNIFICANT AND UNNECESSARY
DIFFICULTIES AND DELAYS DURING THE RE INSTALLATION
PHASE.
• Follow the Flushing Filters procedure to flush
both filters.
•
Open all supply valves to purge the system and
check for proper flow at the secondary filter.
Step 5:
• Close the inflow and outflow valves on the
primary filter.
•
Close the supply valve on the paint tank.
•
Close the paint tank compressed air valve
and open the exhaust valve to bleed pressure
from the tank.
•
Starting at the paint tank valve, begin remov-
ing tubing sections between the primary and
secondary filters, one at time.
• When the first section is removed at the paint
tank supply valve, slowly open the supply valve
and verify proper flow from the tank. Clean
out tank supply valve if necessary.
• If the flow is good from the supply valve, clean
out each tubing section. Remove only one
section of tubing at a time, clean it and flush
it thoroughly with water and then reinstall it.
Repeat this process until the clogged section
is found.
NOTICE:
NEVER REMOVE MORE THAN ONE SECTION AT A TIME. THIS
ENSURES THAT YOU GET EACH SECTION BACK INTO THE
POSITION IT BELONGS IN. REMOVING MULTIPLE SECTIONS
AT A TIME WILL CAUSE SIGNIFICANT AND UNNECESSARY
DIFFICULTIES AND DELAYS DURING THE RE INSTALLATION
PHASE.
• Follow the Flushing Filters procedure to flush
both filters.
•
Open all supply valves to purge the system
and check for proper flow at the secondary
filter and spray guns.
Содержание PAINT HOG
Страница 2: ......
Страница 10: ...10 NOTES...
Страница 50: ...50 NOTES...
Страница 80: ...80 NOTES...
Страница 82: ...82 NOTES...
Страница 85: ......
Страница 86: ......