
3.3 Place the gel sandwich
Rinse away the overlay with distilled water and drain
any excess water.
If installing a self-cast or precast 10
×
8 cm gel sand-
wich, align the bottom of the plate with the bottom
of the core. (Fig. 3a) The bottom of the notched plate
must cover the silicone rubber gasket.
If installing a self-cast or precast 10
×
10.5 cm gel
sandwich, orient the sandwich so that the notched
plate faces the gasket, notches at the top. Set the
bottom of the sandwich on the supporting ledges in
the bottom of the lower chamber and center the plate
so that the gasket seals both sides. (Fig. 3b)
Fig. 3a–b.
Gel sandwich
installation.
•
p9
Fig 3a.
A 10
×
8 cm gel sandwich
fits flush with the bottom of the
upper buffer chamber core.
Fig 3b.
A 10
×
10.5 cm gel sand-
wich fits against the bottom of the
lower buffer chamber.
Содержание SE 260
Страница 1: ...user manual SE 260 um SE260 IM Rev A0 05 04 Hoefer SE 260 mini vertical gel electrophoresis unit...
Страница 2: ......
Страница 4: ...pii...
Страница 26: ...p22...
Страница 30: ...p26...
Страница 31: ......
Страница 32: ...Hoefer Inc 953 Indiana Street San Francisco CA 94107 USA www hoeferinc com Printed in the USA...