
•
p8
Fig 2.
Core installation
and removal.
Install the upper buffer chamber core.
First steady the
lower chamber with one hand and then hold the core
with the other hand, position it on the positioning
tabs, and press down, listening for the core to snap
into place. (Alternatively, depress both release tabs at
either side, position the core on the positioning tabs,
press into place, and release the tabs. Check that the
core is secure.)
To remove the core,
depress both release
tabs and lift.
To install the core, position it over the
positioning tabs. Then either press
down, listening for the core to snap
into place
—OR—
depress both release tabs, set the core
in place, and release.
Handle
Release tabs (2)
Coolant port (2)
Содержание SE 260
Страница 1: ...user manual SE 260 um SE260 IM Rev A0 05 04 Hoefer SE 260 mini vertical gel electrophoresis unit...
Страница 2: ......
Страница 4: ...pii...
Страница 26: ...p22...
Страница 30: ...p26...
Страница 31: ......
Страница 32: ...Hoefer Inc 953 Indiana Street San Francisco CA 94107 USA www hoeferinc com Printed in the USA...