  ESP FIREbeam – Installation Manual 

 2011 Hochiki Europe (UK) Ltd 

2-3-0-1340/ISS2/DEC11 

    

 

2.5  Step 4 - Commissioning 

Commissioning the ESP FIREbeam is a simple procedure outlined in the following step by step explanation. 

2.5.1 

Stage One - Language and Commissioning Speed 

IMPORTANT

.  Do 

NOT

 put the reflector up or 

COVER

 it if already in place. 

Power up the unit and you will see  

 

 

 

the screen will then default to 

 

or 

 

Access the menu by pressing the 

enter

 button 

 

 

 

 

The first screen you see is 

English

.  If you need to change this use the 

right

 and 

left

 hand keys to scroll 

through languages, when you have found your language press 

enter

 or if you are happy with English press the 

down

 key to continue.  If you have changed the language the system will continue in your chosen language. 

Press 

enter

 and you will now see the 

commissioning speed

 screen.  In most cases it is recommended to 

use 

fast

 mode (in normal mode the system uses 3.5mA, in fast mode it uses 17mA) - if you are commissioning 

more than one beam at a time and the system cannot support the extra draw it may be necessary to use normal 
mode to prevent excessive current draw.  Fast mode allows x 4 times faster motor response and it may be quicker 
to commission each beam in turn.  Once commissioning is complete the ESP FIREbeam will automatically revert to 
normal low power mode - (3.5mA). 

Use the 

left

 

and 

right

 keys to toggle between fast and normal, the 

*

 indicates which mode is selected.  Press 

the 

enter

 key to continue. 

 

2.5.2 

Stage Two - Pre-alignment 

The next screen is pre-alignment - this is probably the most important part of setting up your beam.  Pre-alignment 
sets up the amount of power you need for the distance you are covering and can indicate if you are receiving 
unwanted reflections from anything else in the beam path. 

Press 

enter

 to begin pre-alignment.  Remember no reflector.  You will see the screen below, take a moment to 

understand what the figures on the screen mean. 

 

 

 

www.acornfiresecurity.com

www.acornfiresecurity.com

Содержание ESP FIREbeam

Страница 1: ...esp FIREbeam INSTALLATION MANUAL www acornfiresecurity com www acornfiresecurity com...

Страница 2: ...www acornfiresecurity com www acornfiresecurity com...

Страница 3: ...2 Step 2 Programming the Analogue Address 6 2 3 Step 3 Mounting the Controller 7 2 4 Wiring Configuration 7 2 5 Step 4 Commissioning 8 2 5 1 Stage One Language and Commissioning Speed 8 2 5 2 Stage T...

Страница 4: ...ESP FIREbeam comes boxed with the head unit low level controller one reflector 3mm allen key and quick start installation guide this should be used for distances over 5m and up to 40m 1 1 2 40 to 80 m...

Страница 5: ...40m from the floor The maximum protected area either side of the beam can be extended by 1 for every degree of roof pitch see the example below NOTE Careful design consideration should be made when p...

Страница 6: ...the front edge of the box Wire to low level controller using bottom colour coded terminals Screw in through holes provided outside of the rubber seal 2 2 Step 2 Programming the Analogue Address The F...

Страница 7: ...this connection can be checked by reading the resistance across the black and grey terminals they will read 110 ohm if OK or 220 ohm if not connected properly 2 4 Wiring Configuration The output curre...

Страница 8: ...in normal mode the system uses 3 5mA in fast mode it uses 17mA if you are commissioning more than one beam at a time and the system cannot support the extra draw it may be necessary to use normal mod...

Страница 9: ...ng noticeably less read on below These figures are approximate but if you are receiving noticeably less than these figures you may be receiving a reflection from an object nearby and not the far wall...

Страница 10: ...higher the AQ the quicker it will auto align This is done by manually moving the x and y motors to obtain a received signal from the reflector In the example below we can see that the reflector is bel...

Страница 11: ...low 100 Now proceed to Step 4 Testing the final stage of commissioning 2 6 Step 5 Testing 2 6 1 Fault Test This is done to confirm that the returned signal is from the reflector Cover the entire refle...

Страница 12: ...it will reset to normal automatically FAULT The beam path has been fully blocked within 1 second used when fault testing in commissioning ERROR No communication with the controller This could be that...

Страница 13: ...ress down to go through the main menu options Select this option to change system language Select this option to commission the ESP FIREbeam Select this option to make all changes and adjustments to t...

Страница 14: ...automatically stop when a received signal strength reaches 6 this received signal is the returned strength of the output signal without a reflector if no return signal is received the beam will reach...

Страница 15: ...ved signal raises above the fire threshold hysteresis This can be set to latching if your system requires this Change by using the right and left keys Press enter to return to Mode Change or down to g...

Страница 16: ...enter to return to Mode Change or down to go to Hysteresis Hysteresis Changing the hysteresis will change the delay in returning from a fire state back to a normal state For example the beam is facto...

Страница 17: ...to Beam Maintenance or down to go to Alarm Fault Event Counts Alarm Fault Event Counts Here we can see how many times the beam has gone into fire or fault since the beam was commissioned or since the...

Страница 18: ...t and left keys Press enter to return to Diagnostics or down to go to RX Sensitivity RX Sensitivity This screen shows the receiver sensitivity and can be changed by using the right and left keys Press...

Страница 19: ...larm Condition adjustable 2 to 30 seconds in 1 second increments default 10 seconds Alarm Indication Controller Status FIRE Controller Red Flashing LED Head Red Flashing LED Alarm Relay Change Over CO...

Отзывы: