![Hitachi RCI-1.5TNE1NH Скачать руководство пользователя страница 24](http://html.mh-extra.com/html/hitachi/rci-1-5tne1nh/rci-1-5tne1nh_installation-and-maintenance-manual_2139380024.webp)
20
1.5/2.0HP
3.0/4.0/5.0/6.0/6.5HP
Gas pipe
(
mm)
Liquid pipe
(
mm)
1
.
5HP
ø9.52
ø6.35
2.0HP
ø12.7
ø6.35
3
.
0HP
ø15.88
ø9.52
4.0/5.0/6.0/6.5
ø19.05
ø9.52
5
.
Refrigerant
Piping
Use refrigerant R410A in the refrigerant cycle (refer to outdoor nameplate). Do not charge
oxygen, acetylene or other flammable and poisonous gases into the refrigerant cycle when
performing a leakage test or an air
-
tight
test. These type of gases are extremely dangerous
and can cause an explosion. It is recommended that compressed air, nitrogen or refrigerant
be used for these type of tests
.
5
.
1
The
Piping
Materials
(
1
)
Prepare locally
-
supplied copper pipes
.
Installation and Maintenance
Model
(
3
)
Select clean copper pipes
.
Make sure there is no dust and moisture inside
.
Blow the pipes
with nitrogen or dry air to remove dust and foreign materials before connecting pipes.
5
.
2
The
Piping
Connection
(
1
)
Position of piping connection is shown in Fig
.
5
.
1
.(
Indoor Unit
)
Liquid pipe connector
Gas pipe connector
Hole for cords and cables
Drain pipe connector
Check water pump here
Tightening Torque N.m
Pipe Size(mm)
(2) When tightening the flare nut, use two spanners as shown in Fig.5.2.
6
.
35
20
φ
12.7
60
25 (Liquid Pipe)
18 (Gas Pipe)
840 (Unit)
(mm)
840 (Unit)
180 (Liquid Pipe)
110 (Gas Pipe)
Liquid Pipe Connection
Gas Pipe Connection
(Liquid Pipe Connection)
(Gas Pipe Connection)
127
102
Fig
.
5
.
1
Position of Piping Connection
Fig
.
5
.
2 Tightening work of Flare Nut
Содержание RCI-1.5TNE1NH
Страница 31: ......