![Hitachi RCI-1.5TNE1NH Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/hitachi/rci-1-5tne1nh/rci-1-5tne1nh_installation-and-maintenance-manual_2139380015.webp)
11
(
unit
:
mm
)
Model
Capacity
(
HP
)
H
1.5/2.0
270
3.0/4.0
248
5.0/6.0/6.5
298
1.5/2
.
0HP
3
.
0
~
6
.
5HP
3
.
1
The
Initial
Check
●
Install
the
indoor
unit
with
a
proper
clearance
around
it
for
operation
and
maintenance space
,
as shown in Fig
.
3
.
1
.
●
Provide
a
service
access
door
near
the
unit
piping
connection
area
on
the
ceiling
.
●
Ensure that the ceiling has sufficient strength to hang the indoor unit
.
●
Check that the ceiling
surface
is
flat
for
the
air
panel
installation
work
.
Installation and Maintenance
●
Select the installation location as shown in Fig 3
.
2
:
(A) Minimum
Space
(B) Down
Slope
Pitch
of
Drain
Piping
:
1
/
25
~
1
/
100
H
●
Consider the air distribution from the indoor unit to the space of the room
,
and select a suitable
location so that uniform air temperature distribution can be obtained in the room. It is recommended that the
indoor unit is installed 2.5 to 3 meters from the floor level.
●
Do not install flammable parts in the service space for the indoor unit
.
●
Avoid obstacles which may hamper the air intake or the air discharge flow.
Distance from Wall Side
500mm Min.
100mm Min.
100mm Min.
500mm Min.
1000mm Min.
Piping
Connection Side
Service Space
Fig. 3.1 Space around Indoor Unit
Fig. 3.2 Installation Location of Indoor Unit
Clearance 10 to 20mm
Unit Hight
in False Ceiling
Drain Piping
Down Slope
Pitch: 1/25 to 1/100
Содержание RCI-1.5TNE1NH
Страница 31: ......