
2-116
SERVICING
(2.11 Cleaning Indoor Unit Heat Exchanger)
2.11 Cleaning Indoor Unit Heat Exchanger
2.11.1 Required Tools for Cleaning (for All Indoor Units)
No.
No.
Tool
Remark
1
Cleaning Water Pump
2
Water Tank
Approx. 18 liters
Clean Water
A water pump equipped with
3
Nozzle
Attached with Water Pump
a tank is recommended.
4
Brush
If the heat exchanger is heavily
(non-metal)
clogged with dust, remove it
with this brush. The length of
brush should be 25 to 35mm.
5
Hose for
Select a hose according to
Water Pan
site requirements.
6
Bucket
2 Nos. for 5 liters
7
Phillips
1 No.
Screwdriver
8
Nipper
1 No.
9
Adjustable
1 No.
Wrench
10 Megohm Tester
500V
11 Cleaning Agent
Select a neutral type cleaning
agent.
12 Spray
To spray cleaning water.
13 Tape with
To fix the vinyl sheet to protect
Adhesive
the room from cleaning water.
14 Rope
1m, 4 pieces
15 Vinyl Sheet
Select a vinyl sheet with
0.5mm thickness.
16 Gloves
17 Cleaning Water Collector
* In-the-Ceiling Type
* 4-Way Cassette Type
* 2-Way Cassette Type
* Wall Type
* Ceiling Type
Inner Side of
φ
120 hole should
be covered with felt sheet to
insert the spray nozzle.
Remark
!
Insert
the bar.
Insert the bar.
Transparent
Vinyl Sheet
Boss
Hose
1200
1200
Bar
φ
120
200
1000