17.2 START TEST RUN
After the installation work is completed, test run should be performed.
1
Check to ensure that stop valves (gas and liquid) of the outdoor unit are fully opened.
2
In the case that indoor units are connected to the VRF system, perform the test run of the indoor unit one by one sequentially
and then check accordance of the refrigerant piping system and the electrical wiring system. (If the multiple indoor units are
operated simultaneously, the system can not be inspected the system accordance.).
3
Perform the test run according to the “Installation and Operation Manual” of remote control.
18 MAIN SAFETY AND CONTROL DEVICES
Model
RCD-(0.8-6.0)FSR
For Evaporator Fan Motor
Automatic Reset, Non-Adjustable
Internal Thermostat
Cut-Out
o
C
100+4
For Control Circuit
Fuse capacity
A
5
Freeze Protection
Thermostat
Cut-Out
o
C
0
Cut-In
o
C
14
Thermostat
Differential
o
C
2
MAIN SAFETY AND CONTROL DEVICES
PMML0549 rev.1 - 02/2021 - A10761230A
38
Содержание RCD-2.0FSR
Страница 2: ......