![Hitachi RAS-NP10CTS Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/hitachi/ras-np10cts/ras-np10cts_installation-operation-and-maintenance-instructions_2139529034.webp)
28
TEST RUNNING
Test Running Record
Compile test running records according to Table 5. Utilize these records for periodic o
peration checks
, as
well as for troubleshooting.
Operational Sequence Chart
For models: RAS-NP4US+RAS-NP4CTS through RAS-NP8US+RAS-NP8CTS
: ON
: OFF
Operation
Equipments
Main Power Switch(*1)
OFF
ON
Room Thermostat(*1)
FAN
AUTO
ON
AUTO
COOL
OFF
ON
TH
─
─
─
Electric
Components
Indoor Fan Motor
MIF
Outdoor Fan Motor
MOF
Compressor
MC
Safety Devices
Close Close Close Close Close Close Open
NOTES:
*1
:
Field supplied.
Fig. 14-1. Standard Operation Sequence
Operational Sequence Chart
For models: RAS-NP9US+RAS-NP9CTS through RAS-RAS-NP15CTS
: ON
: OFF
Operation
Equipments
Main Power Switch(*1)
OFF
ON
Room Thermostat(*1)
FAN
AUTO
ON
AUTO
COOL
OFF
ON
TH
(Stage)
COOLING CALL
1st …
ON
ON
ON
ON
OFF
ON
2nd …
ON
ON
ON
OFF
OFF
ON
Electric
Components
Indoor Fan Motor
MIF
Outdoor Fan Motor 1
MOF1
Outdoor Fan Motor 2
MOF2
Normal Start
(*2)
Compressor 1
MC1
Compressor 2
MC2
Reverse Start
(*2)
Compressor 1
MC1
Compressor 2
MC2
Safety Devices
Close Close Close Close Close Close Close Close Open
NOTES:
*1
:
Field supplied.
*2
:
Normal start and reverse start are triggered alternately by the actuation of the first stage switch of room
thermostat.
Fig. 14-2. Standard Operation Sequence
After 3 min.
After 3 min.30 sec.
After 3 min.
Содержание RAS-NP10CTS
Страница 45: ...65MP3196 ...