26
Do not charge the non-specified refrigerants or others in the refrigerant cycle of the unit as
follows when performing a leakage test or an airtight test:
●
Hydrocarbon Refrigerants such as Propane or etc.
●
Oxygen, Flammable Gases such as Acetylene or etc.
●
Poisonous Gases.
This action may cause mechanical troubles, malfunction and failure, and in the worst case,
it endangers safety seriously and may cause a fire or an explosion.
REFRIGERANT PIPING
For Combined Models: RAS-NP4US+RAS-NP4CTS through RAS-NP8US+RAS-NP8CTS
Mark
Name
1
Compressor
2
Condenser
3
Liquid Outlet Stop Valve
4
Accumulator
5
Capillary Tube
6
Evaporator
7
Gas Inlet Stop Valve
8
Check Joint (High Side)
9
Check Joint (Low Side)
10
High Pressure Switch
11
Low Pressure Switch
12
Strainer
: Field Refrigerant Pipe
* : Field-Supplied
For Combined Models: RAS-NP9US + RAS-NP9CTS through RAS- RAS-NP15CTS
Mark
Name
1
Compressor
2
Condenser
3
Liquid Outlet Stop Valve
4
Accumulator
5
Capillary Tube
6
Evaporator
7
Gas Inlet Stop Valve
8
Check Joint (High Side)
9
Check Joint (Low Side)
10
High Pressure Switch
11
Low Pressure Switch
12
Strainer
: Field Refrigerant Pipe
* : Field-Supplied
Fig. 13. Evacuation and Refrigerant Charge
Содержание RAS-NP10CTS
Страница 45: ...65MP3196 ...