5 - 2
(1) Figure 5-1 shows how to connect the units for performance
check. According to this figure, carry out tubing.
Before energizing the system, ensure that the tubing
between the autosampler and pump/detector is properly
connected.
Fig. 5-1 Flow Path Diagram
(2) Connect the e-Line cable among the autosampler, detector
and pump.
(3) Check if the drain tube is properly connected to the waste
liquid bottle. The waste liquid bottle must be at a lower
position than the autosampler.
5.1.2 Preparing the
System for
Operation
Detector (wavelength 250 nm, time constant 0.1 s)
Autosampler
Pump
Load resistance coil
stainless pipe 0.1 mm i.d.
×
10 m long(L-2100)
stainless pipe 0.25 mm i.d.
×
10 m long(L-2130)
Eluent
Detergent
(Injection valve)
(Syringe valve)
Waste liquid
bottle
Waste liquid
bottle
5.1 Checking the Performance and Specifications