2. Equipment connection and network setting
2.5.6 Schedule Setting (Continued)
Item
Description
Specific date No1
Configures the specific date (No.1) schedule.
Schedule
Click the
[Enable]
check box to enable specific date (No.1)
scheduling.
Month/Day
Configures the Month and date.
Schedule List
Displays the current specific date (No.1) schedule.
Specific date No.2
Configures the specific date (No.2) schedule.
Click the
[Apply]
button to save the settings.
Schedule
Click the
[Enable]
check box to enable specific date (No.2)
scheduling.
Month/Day
Configures the Month and date.
Schedule List
Displays the current specific date (No.2) schedule.
Specific date No.3
Configures the specific date (No.3) schedule.
Schedule
Click the
[Enable]
check box to enable specific date (No.3)
scheduling.
Month/Day
Configures the Month and date.
Schedule List
Displays the current specific date (No.3) schedule.
Specific date No.4
Configures the specific date (No.4) schedule.
Schedule
Click the
[Enable]
check box to enable specific date (No.4)
scheduling.
Month/Day
Configures the Month and date.
Schedule List
Displays the current specific date (No.4) schedule.
Specific date No.5
Configures the specific date (No.5) schedule.
Schedule
Click the
[Enable]
check box to enable specific date (No.5)
scheduling.
Month/Day
Set the Month and date.
Schedule List
Displays the current specific date (No.5) schedule.
2.5 Configuring and controlling the projector via a web browser (Continued)
Содержание CP-X608
Страница 4: ... ...