16 - 31
The text size (number of transferred words between STX code and end code) is
selectable between the two given below.
NOTES:
1.
The end code character is settable up to four characters. So
calculate the maximum number of transferable channels according to
the expression shown below. (Fractions are rounded down and a
numerical value '48' indicates the total byte count of fixed length n in
Table 6-4.) Text size: 256 or 512 bytes
Maximum number of transferable channels <
Text size
−
48
10
2.
In batch communication in the 256-byte mode, data is sent in up to
five texts for each sample.
In this case, the analyzer sends the first text and then the next one
soon after reception of the MOR frame from the host.
3.
The total number of analytical data to be transferred is variable
according to the number of specified channels.
4.
When ISE data or serum indexes extend into the next text, they are
set in it for transfer.
5.
When the absence of ISE unit is set on the system setting screen or
by the DIP switch, the analytical data of ISE tests will not be sent.
1)
Channel count (3 characters)
The number of channels to be transferred in one text is sent.
NOTE:
The analyzer transfers data for up to 36 channels in both
real-time communication and batch communication.
When including serum indexes (three tests of lipemia,
hemolysis and icterus), electrolytes (three tests of Na, K
and Cl) and calculation tests (8 tests), data for up to 50
channels is transferable.
2)
Analytical data 1 to n (10 characters each)
Channel count (right-justified)
Example: "bb1" or "001"
"b10"
Transfer sequence
10
2
10
1
10
0
Data alarm (1 character)
Measured value (6 characters)
Channel No. (3 characters),
right-justified
10
2
10
1
10
0
10
5
...........................
10
0
10
0
Содержание 902
Страница 47: ...2 35 ...
Страница 74: ...2 62 ...
Страница 84: ...2 72 2 6 2 Parameter Code List ...
Страница 91: ...2 79 ...
Страница 94: ...3 2 SV4 SV10 SV9 SV5 SV6 SV8 SY2 SY3 SY16 ...
Страница 97: ...3 5 ...
Страница 107: ...4 4 ...
Страница 109: ...4 6 ...
Страница 119: ...5 9 ...
Страница 120: ...5 10 ...
Страница 121: ...5 11 ...
Страница 122: ...5 12 ...
Страница 123: ...5 13 ...
Страница 124: ...5 14 ...
Страница 125: ...5 15 ...
Страница 126: ...5 16 ...
Страница 127: ...5 17 ...
Страница 128: ...5 18 ...
Страница 129: ...5 19 ...
Страница 130: ...5 20 ...
Страница 131: ...5 21 ...
Страница 132: ...5 22 ...
Страница 133: ...5 23 ...
Страница 142: ...7 1 7 EXPLANATION OF FUNCTION ...
Страница 143: ...7 2 ...
Страница 144: ...7 3 ...
Страница 146: ...7 5 ...
Страница 147: ...7 6 ...
Страница 149: ...7 8 2 Operation reagent probe 1 Reagent probe status transition ...
Страница 150: ...7 9 3 Operation photometry ISE measuremment sequence ...
Страница 151: ...7 10 ...
Страница 152: ...7 11 7 1 8 Photometer Check ...
Страница 153: ...7 12 7 1 9 Water Exchange Incubator Water Exchange ...
Страница 161: ...7 20 ...
Страница 162: ...7 21 7 3 1 Status Transition routine easy analysis ...
Страница 163: ...7 22 ...
Страница 164: ...7 23 7 3 1 Status Transition easy analysis mode ...
Страница 165: ...7 24 ...
Страница 175: ...7 34 5 Rinse Nozzle Arrangement ...
Страница 176: ...7 35 7 5 Maintenance Functions ...
Страница 177: ...7 36 ...
Страница 179: ...7 38 Details of Mechanism Check ...
Страница 180: ...7 39 11 ...
Страница 181: ...7 40 00 ...
Страница 182: ...7 41 ...
Страница 184: ...7 43 ...
Страница 188: ...7 47 ...
Страница 190: ...7 49 ...
Страница 191: ...7 50 ...
Страница 192: ...7 51 ...
Страница 193: ...7 52 ...
Страница 198: ...8 4 8 3 1 Fuse Arrangement AC DC 1 AC Fuses on ACDIST board F2 F3 F4 F5 F1 150 190 ...
Страница 199: ...8 5 2 DC Fuses on DRV board F4 F3 F2 F1 F10 F9 F6 F8 F5 F7 390 230 ...
Страница 200: ...8 6 ...
Страница 207: ...9 4 1 ...
Страница 208: ...9 5 1 ...
Страница 209: ...9 6 1 ...
Страница 214: ...9 11 1 ...
Страница 219: ...10 1 10 CIRCUIT DIAGRAMS ...
Страница 220: ...10 2 ...
Страница 224: ...10 6 ...
Страница 231: ...10 13 ...
Страница 236: ...10 18 3 External View Connector for FDD DS supply connector 144 263 ...
Страница 237: ...10 19 VRT 250 MVSB100 1 5 ...
Страница 238: ...10 20 VRT 250 MVSB100 2 5 ...
Страница 239: ...10 21 VRT 250 MVSB100 3 5 ...
Страница 240: ...10 22 VRT 250 MVSB100 4 5 ...
Страница 241: ...10 23 VRT 250 MVSB100 5 5 ...
Страница 244: ...10 26 DI Circuit 27135200 1 5 ...
Страница 245: ...10 27 DI Circuit 27135200 2 5 ...
Страница 246: ...10 28 DI Circuit 27135200 3 5 ...
Страница 247: ...10 29 Circuit 271352000 4 5 ...
Страница 248: ...10 30 DI Circuit 27135200 5 5 ...
Страница 250: ...10 32 2 External View ...
Страница 251: ...10 33 ...
Страница 252: ...10 34 ...
Страница 253: ...10 35 ...
Страница 254: ...10 36 ...
Страница 255: ...10 37 ...
Страница 256: ...10 38 ...
Страница 257: ...10 39 ...
Страница 258: ...10 40 ...
Страница 259: ...10 41 ...
Страница 260: ...10 42 ...
Страница 262: ...10 44 ...
Страница 264: ...10 46 ...
Страница 265: ...10 47 ...
Страница 266: ...10 48 ...
Страница 267: ...10 49 ...
Страница 269: ...10 51 ...
Страница 271: ...10 53 ...
Страница 273: ...10 55 E SENSOR Circuit Diagram ...
Страница 275: ...11 0 11 CROSS WIRING REFERENC 11 1 Overall Wiring Diagramm 11 2 11 2 Cross Wiring Reference 11 3 ...
Страница 276: ...11 1 11 CROSS WIRING REFERENCE ...
Страница 277: ...11 2 ...
Страница 278: ...11 3 ...
Страница 279: ...11 4 ...
Страница 280: ...11 5 ...
Страница 281: ...11 6 ...
Страница 282: ...11 7 ...
Страница 283: ...11 8 ...
Страница 284: ...11 9 ...
Страница 285: ...11 10 ...
Страница 286: ...11 11 ...
Страница 287: ...11 12 ...
Страница 288: ...11 13 ...
Страница 289: ...11 14 ...
Страница 290: ...11 15 ...
Страница 291: ...11 16 ...
Страница 292: ...11 17 ...
Страница 293: ...11 18 ...
Страница 294: ...11 19 ...
Страница 295: ...11 20 ...
Страница 296: ...11 21 ...
Страница 297: ...11 22 ...
Страница 298: ...11 23 ...
Страница 299: ...11 24 ...
Страница 300: ...11 25 ...
Страница 301: ...11 26 ...
Страница 302: ...11 27 ...
Страница 303: ...11 28 ...
Страница 305: ...12 1 12 INSTALLATION 12 0 Analyzer unit unpack manual ...
Страница 306: ...12 2 ...
Страница 326: ...13 0 13 MAINTENANCE AND INSPECTION 13 Maintenance and Inspection 13 1 ...
Страница 334: ...14 6 ...
Страница 335: ...14 7 ...
Страница 353: ...15 6 ...
Страница 357: ...15 10 15 4 Printer FTP 020UCS530 01A 15 4 1 Configuration This printer consists of mechanical section and driver ...
Страница 373: ...16 6 ...
Страница 374: ...16 7 ...
Страница 375: ...16 8 ...
Страница 390: ...16 23 ...
Страница 418: ...16 51 ...
Страница 419: ...16 52 ...
Страница 421: ...16 54 ...
Страница 426: ...16 59 ...