12 - 16
(12) Installation Display Screen (indicates that time chart data and program is under
installation)
Installation is under execution.
FD –> EEPROM
FILE NAME xxxxxxxx. xxx
The name of file being installed (xxxxxxxx. xxx) is displayed.
Upon completion of installing all files in the installation FD (no. 3), the following screen is
displayed.
(13) Installation End Display Screen
Installation has been completed
normally.
Pull out FD from drive 1/2.
Turn on power again and
check operation. xxxx
Warning indication (W)
:
Displayed if the number of accesses to EEPROM
exceeds 50,000.
SUM value indication (XXXX)
:
Display of SUM value for area installed to EEPROM
(Make sure that the displayed SUM value is correct.)
Pull out the FD from drive 1 and drive 2, turn on power again and check operation.
12.11.3
Check Items
After installation, check the following items.
(1)
The SUM value on the installation end display screen is as follows.
xxxx
OK
NG
(2)
Upon powering on the instrument, the version of screen information (at lower right of
screen) is displayed as follows.
xxx
OK
NG
Содержание 902
Страница 47: ...2 35 ...
Страница 74: ...2 62 ...
Страница 84: ...2 72 2 6 2 Parameter Code List ...
Страница 91: ...2 79 ...
Страница 94: ...3 2 SV4 SV10 SV9 SV5 SV6 SV8 SY2 SY3 SY16 ...
Страница 97: ...3 5 ...
Страница 107: ...4 4 ...
Страница 109: ...4 6 ...
Страница 119: ...5 9 ...
Страница 120: ...5 10 ...
Страница 121: ...5 11 ...
Страница 122: ...5 12 ...
Страница 123: ...5 13 ...
Страница 124: ...5 14 ...
Страница 125: ...5 15 ...
Страница 126: ...5 16 ...
Страница 127: ...5 17 ...
Страница 128: ...5 18 ...
Страница 129: ...5 19 ...
Страница 130: ...5 20 ...
Страница 131: ...5 21 ...
Страница 132: ...5 22 ...
Страница 133: ...5 23 ...
Страница 142: ...7 1 7 EXPLANATION OF FUNCTION ...
Страница 143: ...7 2 ...
Страница 144: ...7 3 ...
Страница 146: ...7 5 ...
Страница 147: ...7 6 ...
Страница 149: ...7 8 2 Operation reagent probe 1 Reagent probe status transition ...
Страница 150: ...7 9 3 Operation photometry ISE measuremment sequence ...
Страница 151: ...7 10 ...
Страница 152: ...7 11 7 1 8 Photometer Check ...
Страница 153: ...7 12 7 1 9 Water Exchange Incubator Water Exchange ...
Страница 161: ...7 20 ...
Страница 162: ...7 21 7 3 1 Status Transition routine easy analysis ...
Страница 163: ...7 22 ...
Страница 164: ...7 23 7 3 1 Status Transition easy analysis mode ...
Страница 165: ...7 24 ...
Страница 175: ...7 34 5 Rinse Nozzle Arrangement ...
Страница 176: ...7 35 7 5 Maintenance Functions ...
Страница 177: ...7 36 ...
Страница 179: ...7 38 Details of Mechanism Check ...
Страница 180: ...7 39 11 ...
Страница 181: ...7 40 00 ...
Страница 182: ...7 41 ...
Страница 184: ...7 43 ...
Страница 188: ...7 47 ...
Страница 190: ...7 49 ...
Страница 191: ...7 50 ...
Страница 192: ...7 51 ...
Страница 193: ...7 52 ...
Страница 198: ...8 4 8 3 1 Fuse Arrangement AC DC 1 AC Fuses on ACDIST board F2 F3 F4 F5 F1 150 190 ...
Страница 199: ...8 5 2 DC Fuses on DRV board F4 F3 F2 F1 F10 F9 F6 F8 F5 F7 390 230 ...
Страница 200: ...8 6 ...
Страница 207: ...9 4 1 ...
Страница 208: ...9 5 1 ...
Страница 209: ...9 6 1 ...
Страница 214: ...9 11 1 ...
Страница 219: ...10 1 10 CIRCUIT DIAGRAMS ...
Страница 220: ...10 2 ...
Страница 224: ...10 6 ...
Страница 231: ...10 13 ...
Страница 236: ...10 18 3 External View Connector for FDD DS supply connector 144 263 ...
Страница 237: ...10 19 VRT 250 MVSB100 1 5 ...
Страница 238: ...10 20 VRT 250 MVSB100 2 5 ...
Страница 239: ...10 21 VRT 250 MVSB100 3 5 ...
Страница 240: ...10 22 VRT 250 MVSB100 4 5 ...
Страница 241: ...10 23 VRT 250 MVSB100 5 5 ...
Страница 244: ...10 26 DI Circuit 27135200 1 5 ...
Страница 245: ...10 27 DI Circuit 27135200 2 5 ...
Страница 246: ...10 28 DI Circuit 27135200 3 5 ...
Страница 247: ...10 29 Circuit 271352000 4 5 ...
Страница 248: ...10 30 DI Circuit 27135200 5 5 ...
Страница 250: ...10 32 2 External View ...
Страница 251: ...10 33 ...
Страница 252: ...10 34 ...
Страница 253: ...10 35 ...
Страница 254: ...10 36 ...
Страница 255: ...10 37 ...
Страница 256: ...10 38 ...
Страница 257: ...10 39 ...
Страница 258: ...10 40 ...
Страница 259: ...10 41 ...
Страница 260: ...10 42 ...
Страница 262: ...10 44 ...
Страница 264: ...10 46 ...
Страница 265: ...10 47 ...
Страница 266: ...10 48 ...
Страница 267: ...10 49 ...
Страница 269: ...10 51 ...
Страница 271: ...10 53 ...
Страница 273: ...10 55 E SENSOR Circuit Diagram ...
Страница 275: ...11 0 11 CROSS WIRING REFERENC 11 1 Overall Wiring Diagramm 11 2 11 2 Cross Wiring Reference 11 3 ...
Страница 276: ...11 1 11 CROSS WIRING REFERENCE ...
Страница 277: ...11 2 ...
Страница 278: ...11 3 ...
Страница 279: ...11 4 ...
Страница 280: ...11 5 ...
Страница 281: ...11 6 ...
Страница 282: ...11 7 ...
Страница 283: ...11 8 ...
Страница 284: ...11 9 ...
Страница 285: ...11 10 ...
Страница 286: ...11 11 ...
Страница 287: ...11 12 ...
Страница 288: ...11 13 ...
Страница 289: ...11 14 ...
Страница 290: ...11 15 ...
Страница 291: ...11 16 ...
Страница 292: ...11 17 ...
Страница 293: ...11 18 ...
Страница 294: ...11 19 ...
Страница 295: ...11 20 ...
Страница 296: ...11 21 ...
Страница 297: ...11 22 ...
Страница 298: ...11 23 ...
Страница 299: ...11 24 ...
Страница 300: ...11 25 ...
Страница 301: ...11 26 ...
Страница 302: ...11 27 ...
Страница 303: ...11 28 ...
Страница 305: ...12 1 12 INSTALLATION 12 0 Analyzer unit unpack manual ...
Страница 306: ...12 2 ...
Страница 326: ...13 0 13 MAINTENANCE AND INSPECTION 13 Maintenance and Inspection 13 1 ...
Страница 334: ...14 6 ...
Страница 335: ...14 7 ...
Страница 353: ...15 6 ...
Страница 357: ...15 10 15 4 Printer FTP 020UCS530 01A 15 4 1 Configuration This printer consists of mechanical section and driver ...
Страница 373: ...16 6 ...
Страница 374: ...16 7 ...
Страница 375: ...16 8 ...
Страница 390: ...16 23 ...
Страница 418: ...16 51 ...
Страница 419: ...16 52 ...
Страница 421: ...16 54 ...
Страница 426: ...16 59 ...