3 - 4
3.4
WASH
3.4.1
Details of WASH Processing
Step No.
Contents of Processing
Reference Document
1)
Start from MAINTENANCE screen
Screen specifications
2)
See next page
3)
4)
When mechanism operates, its operation is checked. If abnormal,
alarm is indicated.
Alarm will be saved into the alarm FD.
Screen specifications
Alarm code table
FD specifications
Remarks:
(1) Start method and resulting action
(a) Specify DAILY.
All cells, probes (S and R), stirrer and ISE mechanism are washed.
(b) Specify reaction cell.
(c)
Specify ISE.
The ISE mechanism is washed.
NOTE:
Specification of ISE for WASH
when without ISE mechanism ............... Input cannot be made from the screen.
Specification of all mechanisms
when without ISE mechanism ............... Operation is carried out according to "cell"
specification.
START
Operator's
judgment
Maintenance
screen
WASH necessary?
"Execution" input
"STOP" input
Operation check
Normal
Alarm indication
FD (alarm logging)
END
Made
Abnormal
WASH
Necessary
Unnecessary
Function
:
Washing of each mechanism
Necessary :
WASH (cell)
15 min 20 sec
WASH (ISE)
5 min 44 sec
WASH (All)
20 min 20 sec
3)
1)
2)
4)
Содержание 902
Страница 47: ...2 35 ...
Страница 74: ...2 62 ...
Страница 84: ...2 72 2 6 2 Parameter Code List ...
Страница 91: ...2 79 ...
Страница 94: ...3 2 SV4 SV10 SV9 SV5 SV6 SV8 SY2 SY3 SY16 ...
Страница 97: ...3 5 ...
Страница 107: ...4 4 ...
Страница 109: ...4 6 ...
Страница 119: ...5 9 ...
Страница 120: ...5 10 ...
Страница 121: ...5 11 ...
Страница 122: ...5 12 ...
Страница 123: ...5 13 ...
Страница 124: ...5 14 ...
Страница 125: ...5 15 ...
Страница 126: ...5 16 ...
Страница 127: ...5 17 ...
Страница 128: ...5 18 ...
Страница 129: ...5 19 ...
Страница 130: ...5 20 ...
Страница 131: ...5 21 ...
Страница 132: ...5 22 ...
Страница 133: ...5 23 ...
Страница 142: ...7 1 7 EXPLANATION OF FUNCTION ...
Страница 143: ...7 2 ...
Страница 144: ...7 3 ...
Страница 146: ...7 5 ...
Страница 147: ...7 6 ...
Страница 149: ...7 8 2 Operation reagent probe 1 Reagent probe status transition ...
Страница 150: ...7 9 3 Operation photometry ISE measuremment sequence ...
Страница 151: ...7 10 ...
Страница 152: ...7 11 7 1 8 Photometer Check ...
Страница 153: ...7 12 7 1 9 Water Exchange Incubator Water Exchange ...
Страница 161: ...7 20 ...
Страница 162: ...7 21 7 3 1 Status Transition routine easy analysis ...
Страница 163: ...7 22 ...
Страница 164: ...7 23 7 3 1 Status Transition easy analysis mode ...
Страница 165: ...7 24 ...
Страница 175: ...7 34 5 Rinse Nozzle Arrangement ...
Страница 176: ...7 35 7 5 Maintenance Functions ...
Страница 177: ...7 36 ...
Страница 179: ...7 38 Details of Mechanism Check ...
Страница 180: ...7 39 11 ...
Страница 181: ...7 40 00 ...
Страница 182: ...7 41 ...
Страница 184: ...7 43 ...
Страница 188: ...7 47 ...
Страница 190: ...7 49 ...
Страница 191: ...7 50 ...
Страница 192: ...7 51 ...
Страница 193: ...7 52 ...
Страница 198: ...8 4 8 3 1 Fuse Arrangement AC DC 1 AC Fuses on ACDIST board F2 F3 F4 F5 F1 150 190 ...
Страница 199: ...8 5 2 DC Fuses on DRV board F4 F3 F2 F1 F10 F9 F6 F8 F5 F7 390 230 ...
Страница 200: ...8 6 ...
Страница 207: ...9 4 1 ...
Страница 208: ...9 5 1 ...
Страница 209: ...9 6 1 ...
Страница 214: ...9 11 1 ...
Страница 219: ...10 1 10 CIRCUIT DIAGRAMS ...
Страница 220: ...10 2 ...
Страница 224: ...10 6 ...
Страница 231: ...10 13 ...
Страница 236: ...10 18 3 External View Connector for FDD DS supply connector 144 263 ...
Страница 237: ...10 19 VRT 250 MVSB100 1 5 ...
Страница 238: ...10 20 VRT 250 MVSB100 2 5 ...
Страница 239: ...10 21 VRT 250 MVSB100 3 5 ...
Страница 240: ...10 22 VRT 250 MVSB100 4 5 ...
Страница 241: ...10 23 VRT 250 MVSB100 5 5 ...
Страница 244: ...10 26 DI Circuit 27135200 1 5 ...
Страница 245: ...10 27 DI Circuit 27135200 2 5 ...
Страница 246: ...10 28 DI Circuit 27135200 3 5 ...
Страница 247: ...10 29 Circuit 271352000 4 5 ...
Страница 248: ...10 30 DI Circuit 27135200 5 5 ...
Страница 250: ...10 32 2 External View ...
Страница 251: ...10 33 ...
Страница 252: ...10 34 ...
Страница 253: ...10 35 ...
Страница 254: ...10 36 ...
Страница 255: ...10 37 ...
Страница 256: ...10 38 ...
Страница 257: ...10 39 ...
Страница 258: ...10 40 ...
Страница 259: ...10 41 ...
Страница 260: ...10 42 ...
Страница 262: ...10 44 ...
Страница 264: ...10 46 ...
Страница 265: ...10 47 ...
Страница 266: ...10 48 ...
Страница 267: ...10 49 ...
Страница 269: ...10 51 ...
Страница 271: ...10 53 ...
Страница 273: ...10 55 E SENSOR Circuit Diagram ...
Страница 275: ...11 0 11 CROSS WIRING REFERENC 11 1 Overall Wiring Diagramm 11 2 11 2 Cross Wiring Reference 11 3 ...
Страница 276: ...11 1 11 CROSS WIRING REFERENCE ...
Страница 277: ...11 2 ...
Страница 278: ...11 3 ...
Страница 279: ...11 4 ...
Страница 280: ...11 5 ...
Страница 281: ...11 6 ...
Страница 282: ...11 7 ...
Страница 283: ...11 8 ...
Страница 284: ...11 9 ...
Страница 285: ...11 10 ...
Страница 286: ...11 11 ...
Страница 287: ...11 12 ...
Страница 288: ...11 13 ...
Страница 289: ...11 14 ...
Страница 290: ...11 15 ...
Страница 291: ...11 16 ...
Страница 292: ...11 17 ...
Страница 293: ...11 18 ...
Страница 294: ...11 19 ...
Страница 295: ...11 20 ...
Страница 296: ...11 21 ...
Страница 297: ...11 22 ...
Страница 298: ...11 23 ...
Страница 299: ...11 24 ...
Страница 300: ...11 25 ...
Страница 301: ...11 26 ...
Страница 302: ...11 27 ...
Страница 303: ...11 28 ...
Страница 305: ...12 1 12 INSTALLATION 12 0 Analyzer unit unpack manual ...
Страница 306: ...12 2 ...
Страница 326: ...13 0 13 MAINTENANCE AND INSPECTION 13 Maintenance and Inspection 13 1 ...
Страница 334: ...14 6 ...
Страница 335: ...14 7 ...
Страница 353: ...15 6 ...
Страница 357: ...15 10 15 4 Printer FTP 020UCS530 01A 15 4 1 Configuration This printer consists of mechanical section and driver ...
Страница 373: ...16 6 ...
Страница 374: ...16 7 ...
Страница 375: ...16 8 ...
Страница 390: ...16 23 ...
Страница 418: ...16 51 ...
Страница 419: ...16 52 ...
Страница 421: ...16 54 ...
Страница 426: ...16 59 ...