Hisense B2B
2
8.2
Custom concrete foundation
..............................................................................................................
13
8.2.1
Foundation
......................................................................................................................................
8.2.2
Cable
...............................................................................................................................................
8.3
Installation Hole
..................................................................................................................................
14
8.4
Lift product
.........................................................................................................................................
9
Power on testing
16
9.1
safety testing
.......................................................................................................................................
9.2
Power-on procedure
...........................................................................................................................
9.2.1
External power supply
....................................................................................................................
9.2.2
Switch off power
..............................................................................................................................
9.2.3
Display status test
10
Thermal management
.................................................................................................................................
17
10.1
Introduction
........................................................................................................................................
11
Media player
12 OS
................................................................................................................................................................
Страница 1: ...Beyond An Immersive Experience 2022 User Manual Outdoor Series 49OA25PT Issue Date 14 04 2022 Copyright 2022 All Rights Reserved...
Страница 2: ...on 3 2 2 Power Voltage 4 2 3 Avoid Water 4 2 4 No Touch 4 2 5 Avoid Open Flame 4 2 6 Installation Place 4 2 7 Cooling Performance 4 2 8 Clean or Maintenance 4 2 9 Cleaning 4 2 10 Expert Engineer Requi...
Страница 3: ...13 8 3 Installation Hole 14 8 4 Lift product 14 9 Power on testing 16 9 1 safety testing 16 9 2 Power on procedure 16 9 2 1 External power supply 16 9 2 2 Switch off power 16 9 2 3 Display status tes...
Страница 4: ...etc 1 2 Content This manual is introduction for 49SOA25PT include structure technical parameters installation usage maintenance as well as troubleshooting 1 3 Operation instructions Please make sure...
Страница 5: ...Flame Do not install it nearby open flame area and no fire closed to the display 2 6 Installation Place Please follow the instructions and install it firmly on the ground or bracket to prevent any LC...
Страница 6: ...sonal injury 3 Power cable The power cable is 3 meters if no particular request The cable is placed in the bottom of cabinet under display Customer can use or change different cable length as per need...
Страница 7: ...Hisense B2B 6 4 Overall size mm Power Cable...
Страница 8: ...tion 1080 1920 Brightness 2500cd m2 Viewing angle 178 Contrast ratio 3000 1 IP rating IP65 Cooling system Air conditioner Working temp 40 50 Working Humidity 5 100 Working Voltage 220V 10 50HZ Consump...
Страница 9: ...Hisense B2B 8 Rear door Speaker Installation hold Eyebolt LCD 6 2 2D View Door for A C 6 3 Door opening Step 1 Step 2 Step 3 Air ventilation for A C...
Страница 10: ...ure inside Fan Android board Power LCD Switch Reserved Space Power Socket A C 6 5 Cable entrance hole 3 cable entrance hole for A C power cable external power cable and LAN cable Cable entrance hole f...
Страница 11: ...isense B2B 1 7 A C Installation 7 1 A C Removal 7 1 1 Open the A C door A C 7 1 2 Disconnect power cable to A C 7 1 3 Take out A C Draw out tray and take out A C Unscrew and remove Turn the rocker dow...
Страница 12: ...Hisense B2B 1 7 1 4 Draw out tray and take out A C Tray 7 2 A C installation 7 2 1 Put A C in the tray and fix it by rocker Rocker 7 2 2 Connect power cable to A C as below...
Страница 13: ...o less than 800mm to the rear of the cabinet 8 Installation 8 1 Caution before installation 8 1 1 Installation Place Environment This is floor standing mount ensure the concrete must be solid and we p...
Страница 14: ...low to custom concrete foundation the overall size should be larger than base plate size recommended depth of concrete 400mm podium 20mm please make cable entrance hole in 8 2 2 Cable Pre embedded cab...
Страница 15: ...ion dry and solid make 8x installation hole in ground by M16 drill M16 8 4 Lift product Use crane or other tool to lift up product to the concrete and align to installation hole in concrete make sure...
Страница 16: ...Hisense B2B 1 Step 1 Install 4 eyebolt Step 2 After installation remove 4 eyebolts and replace it with rubber plug Step 3 Anchoring by dynabolt dynabolt Dynabolt into concrete Cross like this...
Страница 17: ...ll be implemented under the guidance of professional electrical engineer with multi meter 9 2 Power on procedure 9 2 1 External power supply Make sure voltage of power supply is compatible with the pr...
Страница 18: ...The product with air conditioner cooling when inside temperature up to a certain degree the A C will start working please clean the mesh in air vent after long time running 11 Media player Android me...