![Hisense 49SOA25PT Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/hisense/49soa25pt/49soa25pt_user-manual_2138456015.webp)
Hisense B2B
1
Drill
8.3
Installation Hole
After concrete foundation dry and solid, make 8x installation hole in ground by M16 drill.
M16
8.4
Lift product
Use crane or other tool to lift up product to the concrete and align to installation hole in concrete, make sure
the reserved cables pass through the entrance hole in base plate.