Hisense 49SOA25PT Скачать руководство пользователя страница 5

Hisense B2B 

 

 

 

2.2

 

Power Voltage

 

Please make sure the power voltage at the construction site is compatible to the display. 

2.3

 

Avoid Water

 

The kiosk has been tested to meet IP65 for outdoor environment, but please do not immerse the kiosk in the 
water. 

2.4

 

No Touch

 

Do not touch LCD display or cabinet which may scald due to long time sunlight exposure. 

2.5

 

Avoid Open Flame

 

Do not install it nearby open flame area and no fire closed to the display. 

2.6

 

Installation Place

 

Please follow the instructions and install it firmly on the ground or bracket to prevent any LCD damage. 

2.7

 

Cooling Performance

 

There is air inlet & outlet in the rear of cabinet do not cover any object that will impact cooling performance. 

2.8

 

Clean or Maintenance

 

Shut down power before clean or maintenance. 

 

 

2.9

 

Cleaning

 

Use wet cloth to clean rather than liquid cleaners or aerosol cleaners direct on the monitor casing or glass. 

2.10

 

Expert Engineer Required

 

Содержание 49SOA25PT

Страница 1: ...Beyond An Immersive Experience 2022 User Manual Outdoor Series 49OA25PT Issue Date 14 04 2022 Copyright 2022 All Rights Reserved...

Страница 2: ...on 3 2 2 Power Voltage 4 2 3 Avoid Water 4 2 4 No Touch 4 2 5 Avoid Open Flame 4 2 6 Installation Place 4 2 7 Cooling Performance 4 2 8 Clean or Maintenance 4 2 9 Cleaning 4 2 10 Expert Engineer Requi...

Страница 3: ...13 8 3 Installation Hole 14 8 4 Lift product 14 9 Power on testing 16 9 1 safety testing 16 9 2 Power on procedure 16 9 2 1 External power supply 16 9 2 2 Switch off power 16 9 2 3 Display status tes...

Страница 4: ...etc 1 2 Content This manual is introduction for 49SOA25PT include structure technical parameters installation usage maintenance as well as troubleshooting 1 3 Operation instructions Please make sure...

Страница 5: ...Flame Do not install it nearby open flame area and no fire closed to the display 2 6 Installation Place Please follow the instructions and install it firmly on the ground or bracket to prevent any LC...

Страница 6: ...sonal injury 3 Power cable The power cable is 3 meters if no particular request The cable is placed in the bottom of cabinet under display Customer can use or change different cable length as per need...

Страница 7: ...Hisense B2B 6 4 Overall size mm Power Cable...

Страница 8: ...tion 1080 1920 Brightness 2500cd m2 Viewing angle 178 Contrast ratio 3000 1 IP rating IP65 Cooling system Air conditioner Working temp 40 50 Working Humidity 5 100 Working Voltage 220V 10 50HZ Consump...

Страница 9: ...Hisense B2B 8 Rear door Speaker Installation hold Eyebolt LCD 6 2 2D View Door for A C 6 3 Door opening Step 1 Step 2 Step 3 Air ventilation for A C...

Страница 10: ...ure inside Fan Android board Power LCD Switch Reserved Space Power Socket A C 6 5 Cable entrance hole 3 cable entrance hole for A C power cable external power cable and LAN cable Cable entrance hole f...

Страница 11: ...isense B2B 1 7 A C Installation 7 1 A C Removal 7 1 1 Open the A C door A C 7 1 2 Disconnect power cable to A C 7 1 3 Take out A C Draw out tray and take out A C Unscrew and remove Turn the rocker dow...

Страница 12: ...Hisense B2B 1 7 1 4 Draw out tray and take out A C Tray 7 2 A C installation 7 2 1 Put A C in the tray and fix it by rocker Rocker 7 2 2 Connect power cable to A C as below...

Страница 13: ...o less than 800mm to the rear of the cabinet 8 Installation 8 1 Caution before installation 8 1 1 Installation Place Environment This is floor standing mount ensure the concrete must be solid and we p...

Страница 14: ...low to custom concrete foundation the overall size should be larger than base plate size recommended depth of concrete 400mm podium 20mm please make cable entrance hole in 8 2 2 Cable Pre embedded cab...

Страница 15: ...ion dry and solid make 8x installation hole in ground by M16 drill M16 8 4 Lift product Use crane or other tool to lift up product to the concrete and align to installation hole in concrete make sure...

Страница 16: ...Hisense B2B 1 Step 1 Install 4 eyebolt Step 2 After installation remove 4 eyebolts and replace it with rubber plug Step 3 Anchoring by dynabolt dynabolt Dynabolt into concrete Cross like this...

Страница 17: ...ll be implemented under the guidance of professional electrical engineer with multi meter 9 2 Power on procedure 9 2 1 External power supply Make sure voltage of power supply is compatible with the pr...

Страница 18: ...The product with air conditioner cooling when inside temperature up to a certain degree the A C will start working please clean the mesh in air vent after long time running 11 Media player Android me...

Отзывы: