4
Installation MACH1000
Release 06 03/2021
Checking the package contents
Installing an SFP transceiver (optional)
Connecting the power unit connections for supply voltage
and signal contact
2.3.1 Connecting the voltage supply terminals (power
supply unit characteristic value C and G)
2.3.2 Connecting the plugged voltage supply (power
supply unit characteristic value L and M)
2.3.3 Connecting the signal contact
Installing and grounding the device
2.4.1 Mounting in a switch cabinet
2.4.2 Vertical mounting on the wall
2.4.3 Grounding the device
Operating the device
Connecting data cables
2.6.1 Twisted Pair ports
2.6.2 Optical fiber ports
Making basic settings
Monitoring the ambient air temperature
Maintenance and service
Disassembly
Removing the device
Removing an SFP transceiver (optional)
Technical data
Further support
Содержание MACH1000 Series
Страница 69: ...Installation MACH1000 Release 06 03 2021 69...
Страница 70: ......