72
Automatic measurement
4.2 Automatic measurement
The stage is moved and data is imported according to the preset settings and order (sequence).
1
Click
Auto
on the main window.
2
Click
Sequence
.
The script window (window to set the measurement
order) appears.
3
Click the cell of
Items
.
4
Select an item.
(Reference: “Main sequence item list” (p. 73))
5
Repeat step
3
and
4
and select all
required items.
6
Set the details of each item.
(Reference: “Main sequence item list” (p. 73))
7
Click
Close
.
8
Click
Start
on the main window.
When all the main sequence items are completed, 100% is displayed under
Auto Inspection Process Rate
.
Содержание TS2400
Страница 2: ......
Страница 16: ...12 Product Overview ...
Страница 34: ...30 Model Z5018 Switch Box ...
Страница 74: ...70 Connecting the Measuring Instrument and a Workpiece ...
Страница 82: ...78 Automatic measurement ...
Страница 112: ...Appx 2 ...
Страница 113: ......
Страница 114: ......
Страница 115: ......
Страница 116: ......