DTS-60A O
PERATORS
M
ANUAL
52
the After Breakdown Wait Timer, the After Breakdown Stirrer Timer and the
After Breakdown Stage.
The test termination will prompt the user to print a test results receipt
and finally displays a Results screen.
The above operations are illustrated in Figure 5-1.
SIMPLE TEST
Load Stage Info
BreakDown
Interrupt
Output
Voltage
Compute Accurate
High Voltage
Continue to next
stage
Verify Electrodes/Gap
Spacing
Wait for Enter
Key
Compute Statistics
Voltage
Measurement
Voltage
Controller
Breakdown
Detector
Concurrent Processes
LCD Update
Voltage
Wait for
Breakdown
Interrupt
Wait for After
Breakdown Time
Enable Stirrer for After
Breakdown Stirrer
Time
Print Report
end
continue
Figure 5-1 – Test Program Operation Flowchart
Содержание DTS-60A
Страница 1: ...DTS 60A Dielectric Oil Test Set Operator s Manual Version 1 20 HighVoltage INC ...
Страница 3: ...DTS 60A OPERATORS MANUAL ...
Страница 5: ...DTS 60A OPERATORS MANUAL ...
Страница 7: ...DTS 60A OPERATORS MANUAL ...
Страница 10: ......
Страница 48: ...DTS 60A OPERATORS MANUAL 38 ...
Страница 56: ...DTS 60A OPERATORS MANUAL 46 Figure 4 11 Test Program Execution Example ...
Страница 57: ...DTS 60A OPERATORS MANUAL 47 ...
Страница 77: ...DTS 60A OPERATORS MANUAL 67 prg 0 stage 27 003 0 kV s breakdown 00 00 00 00 10 00 00 10 00 end store prg 0 end ...
Страница 81: ...DTS 60A OPERATORS MANUAL 71 ...
Страница 87: ...DTS 60A OPERATORS MANUAL 77 ...
Страница 106: ...DTS 60A OPERATORS MANUAL 96 Figure 8 17 Reading specific result id Figure 8 18 history erase Command ...
Страница 111: ...DTS 60A OPERATORS MANUAL 101 ...