![High Voltage DTS-100A Скачать руководство пользователя страница 40](http://html.mh-extra.com/html/high-voltage/dts-100a/dts-100a_operators-manual_2130380040.webp)
DTS-60A / DTS-100A O
PERATORS
M
ANUAL
STEP 9
STEP 10
The system ask for another test for the same oil
sample. If this is desired the user should press the
ENTER key.
ENTER
0.0
kV
STEP 11
The system returns to STEP 3. Using the UP and
DOWN keys the user will choose the voltage rate
of rise.
The BACK key enables/ disables the stirrer.
The ENTER key starts the next stage the of test.
60.0
PRESS ANY KEY...
kV
STIR
STEP 12
Example of stage where Breakdown does NOT
occur!
The system will stop updating the voltage and the
timer, and will prepare for the next stage.
The user must press any key to continue.
UP
DOWN
BACK
ENTER
ENTER
?
STAGE
2
STAGE
2
The system ask for another test for the same oil
sample. If the user presses the BACK key the test
is terminated.
ENTER
?
TEST:SIMPLE TEST
TEST:SIMPLE TEST
TEST:SIMPLE TEST
TEST:SIMPLE TEST
TIMER:00:01:36
12:10 01/08/16 65°F
Continue
Test?
YES
Continue
Test?
YES
VOLTAGE: 0.5 kV/s
VOLTAGE: 0.5 kV/s
VOLTAGE: 0.5 kV/s
VOLTAGE: 0.5 kV/s
12:10 01/08/16 65°F
12:10 01/08/16 65°F
TIMER:00:00:00
TIMER:00:02:00
TIMER:00:02:00
Figure 3-8c –
Simple Test Example
34