© 1995-2009 Energy Saving Products Ltd.
N
Module CTS Check List & Trouble Shooting
24 Volt Heating/Circuit Board (3/4)
Module CTS Check List & Trouble Shooting (3/4) - 24 Volt Heating/ 24 Volt Circuit Board
St
ar
t
Ver
ify
Line V
olt
age
po
w
er
be
tw
een
L
a
nd
N
Chec
k
Transformer Plugs
Con
nect
ed
?
Ver
ify
24v po
w
er
be
tw
een
R
&
C
Y
Con
nect
Line
Volt
age plug
a
nd
re
tu
rn
to sta
rt
Chec
k tha
t
Line
Volt
age wiring
fr
om
br
ea
ker
is pr
oper
N
Line V
olt
age plug
con
nect
ed?
Y
Y
N
N
24v THERMOST
AT T
O
PCB
R
etu
rn
to
St
ar
t
Trouble Shooting: 24 Volt
Sign
al fr
om
Thermos
tat
? (Chec
k
acr
oss
Y1/Y2 & C
or
W1/W2 & C
)
N
Con
nect
Transformer Plugs
an
d r
etu
rn
to sta
rt
Y
N
Se
t
Thermos
tat
Tem
perature and
Swit
ch
for
Con
sta
nt
fa
n, hea
tin
g or
coolin
g
N
Fan
run
nin
g?
R
ef
er t
o
EPC Mot
or
Troubleshooting
Guide
N
Finished
Y
Fan
run
nin
g?
Y
Y
Y
Y
Chec
k f
or
continu
ity
thr
ough
Thermos
tat
N
R
epla
ce
Thermos
tat
N
R
ef
er t
o
EPC Motor
Troubleshooting
Guide
N
Finished
Chec
k
Thermos
tat
Trouble Shooting: Cooling 24 Volt Circuit Board
Star
t
Thermos
tat
Cooling
Ca
ll
Y
Controller B
oard
ca
ble
plug is re
ver
sible; en
su
re
the
R
ed Wire
on
the p
lu
g is
loca
ted on
the same side a
s
W1 of the Cir
cuit Boa
rd
R
epla
ce
24v
Transformer
Discon
nect
24v
Transformer
plug
with tw
o r
ed wir
es
fr
om mid
dle of cir
cuit
boa
rd a
nd c
hec
k f
or
24v fr
om T
ran
sf
ormer
N
Is
T’St
at
se
t f
or
Cons
tant F
an,
Cooling
or
Heating?
Chec
k
R
esett
able
Fuse (F1)
for
hea
t.
Ca
ution
: Extr
emely ho
t
if tr
ip
ped
Chec
k
for
br
ok
en
or
in
cor
rect wirin
g
be
tw
een
Thermos
tat
and Board
Chec
k
24v Wiring
for
a
dea
d
shor
t a
nd f
or
possible secon
d
24v sou
rce bein
g in
pu
t in
to
the Cir
cu
it Boar
d i.e. Z1 & C
Y
Fix or r
eplace
Wiring
*Sequence of Operation Page is located on
Pg 24
of the HE Installation Manual,
and online at www
.hi-velocity
.com (
Module
WIR -
W
iring and Dip Settings
)
Trouble Shooting: Heating 24 Volt Circuit Board
N
Y
Ver
ify
24v P
ow
er
be
tw
een
G & C
Ver
ify
24v P
ow
er
be
tw
een
Y1/Y2 & C
Y
Blo
w
er Operation
Chec
k Thermosta
t
time dela
y f
or
Y1/Y2
R
ef
er t
o
Trouble
Shooting
EPC Mot
or not
Running
Ca
ll T
ec
hn
ical Su
ppor
t
Freeze St
at
T
ripp
ed
or
n
ot Conn
ect
ed
Y
N
Star
t
Thermos
tat
Heating
Ca
ll
Ver
ify
24v P
ow
er
be
tw
een
W1/W2 & C
Y
Ver
ify
24v P
ow
er
be
tw
een
Z1 & C
Auxiliar
y R
ela
y
Activ
at
ed
Y1 & C
Y2 & C
W1 & C
W2 & C
Y1
for
Mu
lti sta
gin
g
units on
ly
,
Y1
con
tr
ols
blo
w
er on
ly
, r
ef
er
to
the
Seq
uence of
Operation*
Ver
ify
24v P
ow
er
be
tw
een
X1 & C
Ver
ify
24v P
ow
er
be
tw
een
H1 & C
Blo
w
er Operation
Chec
k
Thermos
tat
R
ef
er t
o
Trouble
Shooting
EPC Mot
or not
Running
W1
for
Mu
lti sta
gin
g
units on
ly
,
W1
con
tr
ols blo
w
er
a
nd
Auxiliar
y rela
y. R
ef
er
to the
Seq
uence of
Operation*
Ca
ll T
ec
hn
ical Su
ppor
t
Ca
ll T
ec
hn
ical Su
ppor
t
Y
N
N
N
N
N
Y
Y
N
N