© 1995-2009 Energy Saving Products Ltd.
Ensure that all electrical connections are tight, and
that any packing or shipping restraints are removed
from both the fan coil, and the outdoor unit. With the
power to the condensing unit off, check the thermostat
for normal operation, and again check that there is
proper airflow from all the vents. Ensure that no branch
ducts were damaged or bent sharply. Do not run the
fan coil without a filter in place.
Observe the system pressures during the initial
start-up and charging of the system. Check the voltage
and amp draw of both the fan coil, and the outdoor
unit. The voltages must be within 10% of the rating
plate data. If more than 10% is noted, contact your
local electrical company. Check that the amp draws
of both units are within the information printed on the
unit rating plates. Set the system charge and adjust
the TXV setting according to the RPM-E Installation
Module.
Hi-Velocity Systems
TM
Installation Check List
In the event of difficulty during the start-up procedure, please refer to the
trouble shooting flow charts
to assist you in determining the problem.
Module CTS Check List & Trouble Shooting
Installation Check List (1/4)
Module CTS Check List & Trouble Shooting (1/4) - Installation Check List
Flexible Duct
___ Ensure Rough-In Boots located in unconditioned
spaces are properly sealed and vapour barriered.
___ Ensure no Flex runs are shorter than 10’ (3.05m) or
longer than 25’ (7.62m).
___ Ensure no Flex duct is crushed or torn.
___ Ensure proper bend radius in flex duct.
___ Ensure all Flex connections are secured and sealed at
the plenum and Rough In Boot.
___ Ensure vent plate is properly connected to the rough in
boot, using a vent extender kit if necessary.
___ Ensure flex connections are not kinked at plenum.
___ Ensure all outlet dampers are fully open, and
unobstructed.
___ Ensure all vent caps have been cut out.
Supply Plenum
___ Ensure
a minimum
18” (457mm) of straight plenum
off fan coil (no elbows, tees, outlets, etc.)
___ Ensure plenum and all connections are sealed
(elbows, tee’s, end caps, etc.)
___ Ensure proper system balancing is maintained if Tee’s
have been used in Plenum.
___ Ensure all duct and components in unconditioned
space are insulated with a vapour barrier.
___ Ensure no flex duct is used for supply plenum.
Fan Coil
___ Ensure motor, blower, and coil(s) are free of dirt,
drywall dust, etc.
___ Ensure return air opening has been cut in fan coil.
___ Ensure minimum clearances are met for maintenance
accessibility.
Cooling Coil (If Applicable)
___ Ensure condensate line is vented with a P-trap. (WCM/
WM Coils)
___ Ensure proper slope has been maintained in
condensate line for drainage.
Return Air
___ Ensure correct size return is used
and securely
connected.
___ Ensure filter is installed before fan coil or cooling
module if applicable.