background image

1.2

Block Diagrams

Figure 2: System Block Diagram

Figure 3: CPU/PCIe Switch/NVMe Drive Interface Block Diagram

9

1

Ultrastar Serv24 Overview

Installation Guide

1.2

Block Diagrams

Содержание Ultrastar Serv24 S2122-N24-4

Страница 1: ...Installation Guide Ultrastar Serv24 S2122 N24 4 Version 1 3 August 2018 1ET1084 Long Live Data www hgst com ...

Страница 2: ...quirements 14 1 6 List of Replaceable Components 14 1 7 Supported SKUs 15 1 8 List of Compatible Drives 15 Chapter 2 Safety 16 2 1 Electrostatic Discharge 16 2 2 Optimizing Location 16 2 3 Power Connections 16 2 4 Power Cords 17 2 5 Rackmountable Systems 17 2 6 Safety and Service 17 2 7 Safety Warnings and Cautions 18 Chapter 3 Packaging 19 3 1 Ultrastar Serv24 Packaging Overview 19 3 2 Ultrastar ...

Страница 3: ...20 4 2 Ultrastar Serv24 Installation Procedure 20 Chapter 5 Initial Bringup 31 5 1 Bringing Up the Enclosure 31 Appendix A System Operations Appendices 35 A 1 ESD 35 A 2 System Cooling 35 A 3 Power Requirements 35 A 4 Host Connectivity 36 iii Contents Installation Guide ...

Страница 4: ...KUs on page 15 Updated the List of Compatible Drives on page 15 Revision 1 1 December 2017 Updated the Ultrastar Serv24 Installation Procedure on page 20 Revision 1 2 February 2018 Updated the following List of Replaceable Components on page 14 Revision 1 3 August 2018 4 Revision History Installation Guide ...

Страница 5: ...t Platform Engineering technical support Please be prepared to provide the following information Serial Number S N product name model number and a brief description of the issue Email support hgst com Website http support hgst com 5 Points of Contact Installation Guide ...

Страница 6: ...T representative or on the Internet at support hgst com HGST may have patents or pending patent applications covering subject matter in this document The furnishing of this document does not give you any license to these patents Copyright 2017 2018 Western Digital Corporation or its affiliates Western Digital 5601 Great Oaks Parkway San Jose CA 95119 Long Live Data is a trademark of HGST Inc and i...

Страница 7: ... The maximum Ultrastar Serv24 power cannot exceed 1000W 100 127VAC low line for low line input operation Not all of the Ultrastar Serv24 configurations can operate using Lowline input power The maximum power draw of the enclosure is determined by the specific configuration of CPUs DIMMs PCIe add in cards and compatible NVMe drives It is designed to fit within a 2U rack space and requires a minimum...

Страница 8: ... One dedicated 1 GbE port for IPMI 8 1 Ultrastar Serv24 Overview Installation Guide 1 1 Ultrastar Serv24 Description ...

Страница 9: ...1 2 Block Diagrams Figure 2 System Block Diagram Figure 3 CPU PCIe Switch NVMe Drive Interface Block Diagram 9 1 Ultrastar Serv24 Overview Installation Guide 1 2 Block Diagrams ...

Страница 10: ...Figure 4 I2C Block Diagram 10 1 Ultrastar Serv24 Overview Installation Guide 1 2 Block Diagrams ...

Страница 11: ...emperature 20 C per hour max 30 C per hour max Temperature Gradient 1 C per 300m above 950m 1 C per 300m above 12000m Temperature De rating 8 85 Non Condensing 8 93 Non Condensing Relative Humidity 30 per hour maximum 30 per hour maximum Relative Humidity Gradient 11 1 Ultrastar Serv24 Overview Installation Guide 1 3 Ultrastar Serv24 Specification Summary ...

Страница 12: ...erational Specification 10G 5 ms duration 5 shocks positive and 5 negative in each of 3 axes 30 total shocks 35G 152 in sec trapezoid wave Shock 0 278G Random 5 500 Hz 30 minutes per axis 3 axes X Y Z 1 04G 2 200Hz 15 minutes faces six product faces Vibration 33 47 kg 73 8 lbs Weight 39 23 kg 86 5 lbs Weight w Rails and CMA W 481 8 mm x L 768 2 mm x H 87 mm W 18 8in x L 30 2in x H 3 4in Dimensions...

Страница 13: ... of Drive Slots 184 32 TB Max Raw Data Storage Capacity 1 4 Ultrastar Serv24 Layout Figure 5 Ultrastar Serv24 Layout 1 3 4 2 5 6 Table 5 Ultrastar Serv24 Layout Component Number Rails 1 Drive Bay 2 CMA 3 PSU Bay 4 Chassis Cover w latch 5 Chassis 6 13 1 Ultrastar Serv24 Overview Installation Guide 1 4 Ultrastar Serv24 Layout ...

Страница 14: ...omponent 1EX1036 L6 Enclosure Chassis Redundant PSUs 1200W NIC Dual 10 GbE SPF OCP Card CMA Rails Full set of fan modules 1EX1027 AC Power Cord 2 5m 1EX1134 Drive Blank 1EX1028 PSU 1200W 1EX1038 CMA 1EX1037 Rails 1EX1035 Fan module 1EX1177 Intel VROC Premium Hardware Key 1EX1026 SanDisk X400 SSD M 2 2280 Boot Drive 256GB 1EX1674 Heat Sink 1EX1030 Intel Xeon CPU 5120 w heat sink 1EX1031 Intel Xeon ...

Страница 15: ...Part Number Volume Drive 1EX1018 1 6 TB SanDisk Skyhawk Ultra 1 7DW D ISE 1EX1022 1 6 TB SanDisk Skyhawk Ultra 1 7DW D SE 1EX1016 1 92 TB SanDisk Skyhawk 0 6DW D ISE 1EX1020 1 92 TB SanDisk Skyhawk 0 6DW D SE 1EX1019 3 2 TB SanDisk Skyhawk Ultra 1 2DW D ISE 1EX1023 3 2 TB SanDisk Skyhawk Ultra 1 2DW D SE 1EX1017 3 84 TB SanDisk Skyhawk 0 5DW D ISE 1EX1021 3 84 TB SanDisk Skyhawk 0 5DW D SE 1EX1025...

Страница 16: ...duct can result in lowered system performance or system failure Do not position the unit in an environment that has extreme high temperatures or extreme low temperatures Be aware of the proximity of the unit to heaters radiators and air conditioners Position the unit so that there is adequate space around it for proper cooling and ventilation Consult the product documentation for spacing informati...

Страница 17: ...ons provided within the rackmount instructions Reliable grounding of rack mounted equipment should be maintained If installed in a closed or multi unit rack assembly the operating ambient temperature of the rack environment may be greater than room ambient Therefore consideration should be given to installing the equipment in an environment compatible with the maximum ambient temperature Tma speci...

Страница 18: ...fety instructions and information The following safety symbols may be used throughout the documentation and may be marked on the product and or the product packaging CAUTION Indicates the presence of a hazard that may cause minor personal injury or property damage if the CAUTION is ignored WARNING Indicates the presence of a hazard that may result in serious personal injury if the WARNING is ignor...

Страница 19: ...crews four washers Rails Box Chassis with PSUs and Drives pre installed Chassis in ESD safe bag and foam cushions 2 Power Cables Power Cables in foam cushion 3 2 Ultrastar Serv24 Unpacking Procedure 1 Cut the plastic wrap that surrounds the outer box with a box cutter 2 Cut the secure straps that hold the box together 3 Cut the tape that is holding the box shut with a box cutter 4 Open the outer b...

Страница 20: ...lation process for the Ultrastar Serv24 can begin Start by installing the rails into the rack followed by the in installation of the chassis that contains the PSUs and drives pre installed Finally the CMA power cables and other cabling should be connected to the rear of the enclosure 4 2 Ultrastar Serv24 Installation Procedure 1 Remove the inner rail a Extend the inner portion of the rails until t...

Страница 21: ...l 2 Install the inner rail onto the chassis a Orient the inner rail so that the flat side is facing the enclosure b Align the keyholes on the inner rail to the mounting pegs on the side of the enclosure If the keyholes don t line up with the pegs flip the rail long ways to try and align them Figure 8 Inner Rail Installation 21 4 Installation Installation Guide 4 2 Ultrastar Serv24 Installation Pro...

Страница 22: ...rails are installed in their assigned configuration Install the rails into whole rack unit U sections as seen in the following image The rails will not mount properly if staggered across two different U s Figure 10 Rack Units a Move to the rear of the rack b Orient the rail so that the word REAR that is embossed into the metal of the rail is at the rear end of the rack and the release button is fa...

Страница 23: ...in the U d Pull the rail toward the rack step with the support posts aimed at the holes on the rack stems until the tool less latching mechanism engages the rack Figure 11 Front Rail Mechanism Operation e Move to the front of the rack 23 4 Installation Installation Guide 4 2 Ultrastar Serv24 Installation Procedure ...

Страница 24: ...onal Install the VROC Key Attention The VROC key can only be installed into an enclosure that contains SanDisk Skyhawk or SanDisk Skyhawk Ultra drives Attention Skip this step if your configuration does not require the installation of a VROC Key a If the enclosure lock is secured use a Philips Screwdriver to unlock the latch b Unlatch the enclosure cover by pressing the latch button and lifting th...

Страница 25: ...s located next to the PCIe bracket that covers the M 2s Figure 15 VROC Connector Location e Pressing firmly plug the VROC key into the VROC connector on the motherboard f Seat the cover into place over the enclosure by placing the cover on the chassis and sliding it towards the front of the enclosure 25 4 Installation Installation Guide 4 2 Ultrastar Serv24 Installation Procedure ...

Страница 26: ... into the rack a Pull the rack mounted rails out towards the front of the rack until they are locked in place Figure 17 Rack Mounted Rails Locked b Line up the enclosure with the rack mounted rails and slide it in until the first set of locks engage 26 4 Installation Installation Guide 4 2 Ultrastar Serv24 Installation Procedure ...

Страница 27: ...stalled 6 Install the CMA a The CMA has one arm that is connected to the rails and the enclosure chassis by four connectors The first step in installing the arm for the CMA is to first determine what orientation the arm needs to be in The arm should have the elbow on the left side b Orient the CMA so that the elbow is on the left hand side 27 4 Installation Installation Guide 4 2 Ultrastar Serv24 ...

Страница 28: ...rn it back to its proper location 7 Cable the CMA a Unlatch the elbow side of the CMA arm and swing it forward by pressing the blue button that says push to unlatch it and swing it out b Gather the cables two power cables and one Ethernet cable to install in this right hand side c Open all of the baskets Figure 21 Open Baskets 28 4 Installation Installation Guide 4 2 Ultrastar Serv24 Installation ...

Страница 29: ...the point at which the binding occurred and adjust the seating of cables in the baskets check the connections to the rails and examine the joints of the CMA arm to ensure that they are all functioning properly 9 Make sure the CMA is in operational position by folding the arm in toward the enclosure and attaching the elbow end of the CMA to the connector that is attached to the rail 10 Secure the r...

Страница 30: ...b Secure the enclosure to the rack using the preinstalled screws on each side 30 4 Installation Installation Guide 4 2 Ultrastar Serv24 Installation Procedure ...

Страница 31: ...ed Hat Enterprise Linux x86_64 7 3 Fully supported RedHat Red Hat Enterprise Linux x86_64 7 4 VMD not supported Novell SUSE Linux Enterprise Server 12 SP1 VMD not supported Novell SUSE Linux Enterprise Server 12 SP2 Fully supported Novell SUSE Linux Enterprise Server 12 SP3 Fully supported Ubuntu Ubuntu Server 16 04 Fully supported Ubuntu Ubuntu Server 16 10 Fully supported Ubuntu Ubuntu Desktop 1...

Страница 32: ...5 Setup Utility 4 Press the down arrow until the BMC network configuration is selected and press Enter Figure 26 BMC network configuration 5 Record the Station IP address that appears in the Dedicated Link section Note This IP address will be used to connect to the enclosure through the BMC WebUI 32 5 Initial Bringup Installation Guide 5 1 Bringing Up the Enclosure ...

Страница 33: ...contain a set of two USB 3 0 ports Figure 28 Rear I O USB Ports 8 Once the enclosure loads the BIOS it will provide prompts on how to load the specific OS Complete the installation of the OS according to these prompts 9 After a few minutes the console or laptop will display a prompt to load the preferred operating system Complete the necessary steps to install the OS 10 From a laptop open a web br...

Страница 34: ... default password admin Figure 29 Admin Log in 12 Navigate to Power Control using the Navigation menu Figure 30 Power Control 13 Verify that Web UI displays a connection to the enclosure 34 5 Initial Bringup Installation Guide 5 1 Bringing Up the Enclosure ...

Страница 35: ...closure and all of its components In the case of a warning sensor threshold violation the OTP mechanism will report the warning information to the user through system management protocols If the critical sensor threshold is exceeded the CPUs and memory will be throttled to prevent temperature increases If the shutdown threshold is exceeded the baseboard management controller BMC will shut down the...

Страница 36: ...pecified maximum input current A 4 Host Connectivity The following table displays the list of power cables approved by HGST Table 12 Approved Power Cables Dimension overmold Part Number Type C13 to C14 1EW0027 HGST C13 to C14 BC314 BC313 2 5M UL BIZlink Technology Inc C13 to C14 0096 0011 Well Shin Technology CO LTD 36 A System Operations Appendices Installation Guide A 4 Host Connectivity ...

Отзывы: