Hettich AG, Seestrasse 204a, 8806 Baech, Switzerland
Operator_Manual_Rotolavit II_und_Rotolavit II-S_en_rev2.5
Seite 38
Go to the signs on the right:
To select a program push:
To add a new program push:
To add the first process push:
To edit the name push
at the top:
In this example, the first process is
“FILL”
Push the „FILL 1“ symbol
Below the symbol you can
choose the filling capacity and
the rotation speed at which it
should be filled.
To accept the FILL 1 process
push:
To add another process, click:
9.5 Add a new program