21
en
2. Starting up for the first time
Before starting up the machine for the first time, observe the
following:
NOTE
The machine must only be put into operation for the first
time by a person instructed / authorised to do so by the
manufacturer / distributor or under the manufacturer‘s /
distributor‘s supervision.
•
Check to make sure the machine has been installed in
accordance with the regulations specified!
• Make sure the machine stands firmly!
•
Check to make sure that no foreign objects (tools,
construction material etc.) have been left in the area of the
machine from the assembly process!
•
Check the hoses as well as the pneumatic system‘s hose
connections!
•
Check the safety guards for proper working order!
•
Make sure that moving components can move without
obstruction into the spaces they require and that the safety
distances are observed!
3. Safety check
The machine must only be put into operation by trained and
qualified personnel.
Satisfy yourself that:
• installation, set up and servicing work have been
completed in full and no persons are present in the danger
zone, let alone working on it
• all safety guards / covers are in place
• the compressed air supply is ready for operation
• the controls are readily accessible
4. Malfunctions on start up
On start up, immediately switch OFF the power supply to the
machine if:
• unusual operating noises can be heard
• the machine runs irregularly, oscillates or vibrates
• auxiliary units malfunction
• the motors consume too much power
• there are electrical faults
• tools are overheating
DANGER
Danger from electric shock!
Working on live components in the improper manner
presents a danger to life!
Work on electrical equipment must only be carried out by
authorised electricians!
Establish the cause of any malfunctions with the machine
shut down and made safe and have it rectified by a
qualified and skilled person trained to do so or eliminate the
malfunction yourself if you are in possession of the necessary
qualification.
Only switch the machine back on again once malfunctions
/ faults have been properly and completely rectified!
5. Carrying out trial run with / without material
It is recommended to first carry out a trial run without
material and drill bits to test all functions for proper working
order. If all functions are working properly, fit the required
tool.
Depending on connection, use the hand or foot switch for
function testing.
Start a trial run without material. Afterwards, you should
carry out a test with material.
Check work for correct results. You can start production if all
settings are correct.
Preliminary conditions
• All of the necessary activation processes must have been
carried out
• The compressed air must be turned on
• The machine must be set up for the relevant product
• Make sure the machine is running smoothly and not
erratically
• The operator must always be informed about current work
procedure
6. Concluding start up
• After completing all servicing and set up work, make sure
everything has been done properly
• Check all screws and connections for secure fit
• After completing the check, you should carry out a test
using a component
• Start up may only be concluded once the machine is
working properly
• Now switch the machine off and hand over production to
the operator
• The operator must always be informed about the
production settings currently in effect and given
instruction on work procedure
• Production can now commence.
NOTE
Following servicing work, check all safety guards for
proper working order.
Содержание BlueMax Mini Type 3
Страница 1: ...en Operating manual BlueMax Mini Type 3...
Страница 7: ...7 en...
Страница 17: ...17 en...
Страница 29: ...29 en...
Страница 37: ...37 en Fig 42 Exploded drawing 5...