2.  Starting up for the first time

 

 Before starting up the machine for the first time, observe the 
following:

 

 

  NOTE

 

  

 

The machine must only be put into operation for the first 
time by a person instructed / authorised to do so by the 
manufacturer / distributor or under the manufacturer‘s / 
distributor‘s supervision.

 • 

 

Check to make sure the machine has been installed in 
accordance with the regulations specified!

 

• Make sure the machine stands firmly!

 • 

 

Check to make sure that no foreign objects (tools, 
construction material etc.) have been left in the area of the 
machine from the assembly process!

 • 

 

Check the hoses as well as the pneumatic system‘s hose 
connections!

 • 

 

Check the safety guards for proper working order!

 • 

 

Make sure that moving components can move without 
obstruction into the spaces they require and that the safety 
distances are observed!

3. Safety check

The machine must only be put into operation by trained and 
qualified personnel.

 

Satisfy yourself that:

•  installation, set up and servicing work have been 

completed in full and no persons are present in the danger 
zone, let alone working on it

•  all safety guards / covers are in place

• the compressed air supply is ready for operation

• the controls are readily accessible

4.  Malfunctions on start up

On start up, immediately switch OFF the power supply to the 
machine if:

• unusual operating noises can be heard

• the machine runs irregularly, oscillates or vibrates

• auxiliary units malfunction

• the motors consume too much power

• there are electrical faults

• tools are overheating

 

  

 DANGER

 

   

 Danger from electric shock!

 

  

  

Working on live components in the improper manner 
presents a danger to life!

 

  

  Work on electrical equipment must only be carried out by 

authorised electricians!

Establish the cause of any malfunctions with the machine 
shut down and made safe and have it rectified by a 
qualified and skilled person trained to do so or eliminate the 
malfunction yourself if you are in possession of the necessary 
qualification.

Only switch the machine back on again once malfunctions 
/ faults have been properly and completely rectified!

5.  Carrying out trial run with / without material

It is recommended to first carry out a trial run without 
material and drill bits to test all functions for proper working 
order. If all functions are working properly, fit the required 
tool.

Depending on connection, use the hand or foot switch for 
function testing.

Start a trial run without material. Afterwards, you should 
carry out a test with material.

Check work for correct results. You can start production if all 
settings are correct.

Preliminary conditions

•  All of the necessary activation processes must have been 

carried out

• The compressed air must be turned on

•  The machine must be set up for the relevant product

•  Make sure the machine is running smoothly and not 

erratically

•  The operator must always be informed about current work 

procedure

6.  Concluding start up

•  After completing all servicing and set up work, make sure 

everything has been done properly

•  Check all screws and connections for secure fit

•  After completing the check, you should carry out a test 

using a component

•  Start up may only be concluded once the machine is 

working properly

•  Now switch the machine off and hand over production to 

the operator

•  The operator must always be informed about the 

production settings currently in effect and given 
instruction on work procedure

• Production can now commence.

 

 

  NOTE

 

  

 

Following servicing work, check all safety guards for 
proper working order.

Содержание BlueMax Mini Type 3

Страница 1: ...en Operating manual BlueMax Mini Type 3...

Страница 2: ...guards General requirements for the design and construction of fixed and movable guards EN 60204 1 2006 A1 2009 Safety of machinery Electrical equipment of machines Part 1 General Requirements EN 6100...

Страница 3: ...swered after reading through the instructions you must not put the machine into operation Settle any unanswered questions first by consulting Paul Hettich GmbH Co KG Service Customer Service Paul Hett...

Страница 4: ...ry for missing items 19 4 Dealing with shipping damage 19 5 Site of installation 19 6 Start up 1 General 20 2 Starting up for the first time 21 3 Safety check 21 4 Malfunctions on start up 21 5 Carryi...

Страница 5: ...bstances Maintenance Servicing inspection repair Handling 2 Rating plate NOTE The rating plate is located on the machine The rating plate shows the following information Manufacturer Address Type desi...

Страница 6: ...at I have read and understood the operating manual for the machine Designation BlueMax Mini Type 3 Type Automatic drilling and insertion machine Machine no I furthermore undertake to observe and follo...

Страница 7: ...7 en...

Страница 8: ...e part of the manufacturer for resultant damage Any other use beyond this is deemed to be non intended use The manufacturer shall not be liable for any damage this causes with the risk involved being...

Страница 9: ...l the relevant fittings are pressed into place by means of a manually operated press in frame optional This concludes the machining process Fig 1 BlueMax Mini Type 3 Fig 2 BlueMax Mini Type 3 with acc...

Страница 10: ...e draws attention to a potentially dangerous situation that may lead to death or serious injuries if the safety measures are not followed CAUTION This danger note draws attention to a potentially dang...

Страница 11: ...before they use the machine for the first time The safety guards must never be removed or taken out of operation If safety guards need removing for maintenance and repair work they must be refitted as...

Страница 12: ...continuous sound level is 89 dB A WARNING Hearing damage warning Local conditions may produce elevated sound pressure and cause noise induced hearing loss Operating personnel must be provided with app...

Страница 13: ...ternal checks Immediately report any irregularities or malfunctions to the department person responsible If necessary the machine must be shut down immediately and made safe 9 Safety advice for carryi...

Страница 14: ...y important to check that this basic safety requirement is met and that the machine is provided with adequate fuse protection The manufacturer cannot be held responsible for damage caused by a lacking...

Страница 15: ...machine Fig 6 Foot switch Fig 7 Compressed air connection NOTE The hand switch is not operational when using the foot switch Item Designation Explanation 1 Motor switch Power supply ON OFF 2 Hand swit...

Страница 16: ...getting crushed Fig 11 Labelling drilling and insertion unit Area motor drive Reminder to unplug the mains power plug before changing tools Fig 12 Labelling motor drive Area entire machine Reminder t...

Страница 17: ...17 en...

Страница 18: ...moved During transportation the machines must be properly secured the load must be evenly distributed Avoid jerky movements Set the machine down without bumps or jolts as well as in an upright standi...

Страница 19: ...orted in writing to your own insurance company as well if the transportation risk was insured by the owner 5 Site of installation An even standing surface with a sufficient load capacity is essential...

Страница 20: ...u could get crushed by moving parts if the machine is not shut down The machine must be depressurised and disconnected from the power supply before carrying out maintenance and cleaning work NOTE Impr...

Страница 21: ...n electrical equipment must only be carried out by authorised electricians Establish the cause of any malfunctions with the machine shut down and made safe and have it rectified by a qualified and ski...

Страница 22: ...lling 27 Pressing in 28 1 Preparing machine The BlueMax Mini Type 3 is shipped in cardboard packaging A number of parts and components must be installed to make the machine ready for operation Once as...

Страница 23: ...e connector 1 Recommended air pressure 6 8 bar 100 PSI Fig 19 Air filter unit with quick release connector Connecting to the power supply Connect to the power supply using a 16 ampere plug Before you...

Страница 24: ...nce extension Push half the bracket onto the fence extension and half of it onto the fence then fasten in place with screws and clamping blocks Fig 21 Scaled fence extension Fig 20 Swivel unit with se...

Страница 25: ...e undone on the runner bracket and then tightened again on both sides after the setting has been made The scale shows the edge distance in relation to the main spindle centre of hinge cup Fig 23 Edge...

Страница 26: ...the hinge insertion die including the fixing screws Depth can be adjusted at the threaded studs located on the front face of the insertion dies Fig 26 Insertion die 3 Operating WARNING Warning Hand i...

Страница 27: ...n socket screw 4 Using the scale set pendulum stops on left and right to the required dimensions Fig 32 Pendulum stop with hexagon socket screw WARNING Do not set any stops near the drilling spindles...

Страница 28: ...e down catch with hinge insertion die as far as the stop over the drill hole Fig 36 Insertion die for hinges 3 Initiate the insertion process by pressing manually operated valve 1 and terminate by let...

Страница 29: ...29 en...

Страница 30: ...e safety guards every day for proper working order Regular inspection of the electrical system in compliance with the VDE guidelines WARNING Risk of injury Servicing and maintenance work must only be...

Страница 31: ...nt CAUTION The obligations prescribed in law with regard to avoiding waste and proper recycling disposal must be followed during all work on and with the machines Particularly when carrying out instal...

Страница 32: ...placement and expendable parts 12 Replacement and expendable parts Please note that the manufacturer s declaration or declaration of conformity given by Paul Hettich GmbH Co KG as manu facturer will l...

Страница 33: ...664 Reduction nipple 1 41 x 3 8A 1665 Servicing unit 1 4 assy 1668 Polyurethane hose 6 mm clear 1669 Polyurethane hose 6 mm black 1670 Polyurethane hose 6 mm blue 1671 Plug connector NW 7 2 1672 Switc...

Страница 34: ...oupler assy drilling unit 10 motor 19 for 1 3 kW motor Drilling pattern 4 spindle 38 8 mm 1188 Special drilling unit block 1189 Special drilling unit cover 1190 Customised auxiliary spindle with chuck...

Страница 35: ...1152 1162 1169 1175 1168 1156 1164 1162 1114 1115 1551 1551 1530 1552 1428 1554 1554 1554 1247 1252 1250 1249 1248 1251 1223 1258 1259 1253 1221 1167 1451 1429 1454 1453 1452 1454 1102 1179 1151 1173...

Страница 36: ...52 1661 1669 1954 1163 1225 1265 1684 1264 1660 1654 1682 1638 1959 1659 1671 1125 1651 1668 1654 1454 1632 1633 1637 1665 1662 1664 1659 1760 1760 1662 1680 1260 1686 1656 1689 1690 1688 1663 1687 16...

Страница 37: ...37 en Fig 42 Exploded drawing 5...

Страница 38: ...g 44 BlueMax Mini Type 3 with accessories Pneumatic circuit wiring diagrams 1766 Option Hold down clamp Option Swivel unit Connection for hold down clamp Connection for hold down clamp 1766 Connection...

Страница 39: ...cs CE 1 and 2 bn 3 and 4 bl PE gr ye CE 1 and 2 gr 3 and 4 br 5 and 6 sw PE gr ye UL CSA 1 2 3 and 4 sw PE gr ye UL CSA 1 and 2 rd 3 and 4 br 5 and 6 sw PE or with gr ye P see order U see order I see...

Страница 40: ...en Order no 0 079 116 1702 024_BA_BlueMax mini Typ3_HPH 21Spr Paul Hettich GmbH Co KG Vahrenkampstrasse 12 16 32278 Kirchlengern Germany Phone 49 52 33 77 0 www hettich com...

Отзывы: