19
Assembly, Operation & Maintenance Instructions
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
25
24
27
28
29
30
31
26
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47 48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
66
67
68
69
70
71
72
73
75
74
65
HUB II EXPLODED VIEW
50
Electric Control Box Cover
1
51
Poles System PCB
1
52
Switching Power Supply
1
53
Electric Control Box
1
54
Castor Leg Rear
1
55
Castor Leg Front
1
56
Lockable Castor
2
57
Hex Bolt M6x12mm
16
58
Leg Upper Right Rear
1
58
Foot Rear
1
60
Leg Upper Right Front
1
61
Foot Front
1
62
Thermostat Mount
1
63
Thermostat
1
64
Cabinet Top Panel
1
65
Hex Bolt M8x10mm
4
66
Drawer Bracket
2
67
Rail Assembly
2
68
Drawer Panel
1
69
Cabinet Side Panel
2
70
Door Upper Hinge
2
71
Left Hand Door
1
72
Door Lower Hinge
2
73
Door Handle
2
74
Door Inner Panel
2
75
Right Hand Door
1
Note: List does not include all fasteners.
Содержание Everdure HUB II
Страница 2: ...Inspired by the past Innovated for the future THE OUTDOOR PERFORMANCE...
Страница 21: ...21 Assembly Operation Maintenance Instructions NOTES...
Страница 22: ...22 Assembly Operation Maintenance Instructions NOTES...
Страница 23: ...23 Assembly Operation Maintenance Instructions...
Страница 24: ...everdurebyheston com au everdurebyheston com nz IM Ref HUBII 07 2018 06 FOR OUTDOOR USE ONLY...