6
Description of
the menu navigation and adjustement values
14
6
DESCRIPTION OF THE MENU NAVIGATION AND
ADJUSTEMENT VALUES
6.1
Starting the system
To switch on the display, the following condition must be fulfilled:
The boiler must be connected to the power supply
(see figure 6.1)
If it is fulfilled, the starting process of the display, which takes 1-2 minutes, starts.
If it is fulfilled, the starting process of the display, which takes 1-2 minutes, starts.
figure 6.1: Plug on the boiler for preparation of the power supply
Содержание pelletstar ECO 10
Страница 1: ...OPERATING INSTRUCTIONS Pellet boiler pelletstar ECO 10 60 ...
Страница 39: ...Notes 10 39 10 NOTES ...