
Maintenance schedule
11
75
Item
Procedure
Combustion
chamber tipping
grate
Check burning chamber stones and walls
visually for damages and wear and
conduct cleaning with scraper and broom
(2), afterwards remove ash off burning
chamber. Check and clean burning
chamber vents (3).
Check ignition pipe, if necessary cleaning
Check pivoting grate (4) visually for
damages and wear
Conduct function test of pivoting grate
using the aggregate test
Ash container
Demount ash container cover and check
ash level and empty ash container if
necessary.
Control -
functioning
Check display, operation and faults list
(see chapter fault reports)
Restart T-Control
Control - faults
Opening the front door or ash door of the
boiler
4
2
3
Содержание firematic CONDENSATION 30
Страница 1: ...OPERATING INSTRUCTIONS Wood chips pellets heating system firematic CONDENSATION 30 40 ...
Страница 17: ...Temperature manager 8 17 Fig 8 6 Example temperature manager when time mode without difference ...
Страница 83: ...Annex 15 83 15 ANNEX 15 1 Additional boiler module Hydraulic recommendation 1 ...
Страница 84: ...15 Annex 84 Hydraulic recommendation 2 ...
Страница 85: ...Annex 15 85 15 2 Solar module Program 1 ...
Страница 86: ...15 Annex 86 Program 2 ...
Страница 87: ...Annex 15 87 Program 3 ...
Страница 88: ...15 Annex 88 Program 4 ...
Страница 89: ...Annex 15 89 Program 5 ...
Страница 90: ...15 Annex 90 Program 6 ...
Страница 91: ...Notes 16 91 16 NOTES ...