1
Safety notes
4
1
SAFETY NOTES
◼
Before commissioning, please read the documentation carefully and pay attention to the safety
instructions given in particular. Please consult this manual if anything is unclear.
◼
Make sure that you understand the instructions contained in this manual and that you are sufficiently
informed regarding the way in which the biomass boiler system works. Should you have any queries
at any time, please do not hesitate to contact HERZ.
◼
For safety reasons, the owner of the system must not make any changes to the construction or the
state of the system without consulting the manufacturer or his authorised representative.
◼
Make sure that there is a sufficient supply of fresh air to the boiler room (please heed the relevant
national regulations).
◼
All connections are to be checked before the commissioning of the system in order to make sure that
they are leak-tight. Check all screw connections for strength.
◼
A portable fire-extinguisher of the prescribed size is to be kept by the boiler room. (Please heed the
relevant national regulations).
◼
When opening the door to the combustion chamber, make sure that no flue gas or sparks escape.
Never leave the combustion chamber door open unattended. as toxic gases may escape.
◼
Never heat the boiler using liquid fuels such as petrol or similar.
◼
Carry out maintenance regularly (in accordance with the maintenance schedule) or use our
Customer Service department.
◼
When carrying out maintenance on the system or opening the control unit, the power supply is to be
disconnected and the generally valid safety regulations are to be heeded.
◼
In the boiler room, no fuels may be stored outside the system. It is also not permitted for objects
which are not required for the purpose of operating or carrying out maintenance on the system to be
kept in the boiler room.
◼
When filling the fuel bunker using a pump truck, the boiler must always be switched off. (this is
stamped on the cover of the filling connection). If this instruction is not heeded, flammable and toxic
gases may get into the storage room!
◼
The fuel storage room is to be protected against unauthorised access.
◼
Always disconnect the power supply if you need to enter the fuel storage room.
◼
Always use low-voltage lamps in the fuel storage room (these must be approved for this type of use
by the relevant manufacturer).
◼
The system is only to be operated using the types of fuel prescribed.
◼
Before the ash is transported further, it must be stored temporarily for at least 96 hours in order to let
it cool down.
◼
Should you have any queries, please call us on +43 3357 / 42840-840.
◼
Initial commissioning must be carried out by the HERZ Customer Service department or an
authorised specialist (otherwise any warranty claim will not be applicable).
◼
Ventilate fuel storage room for ~ 60 minutes before trespassing (Please refer to the respective
country regulations).
◼
The boiler meets the requirements of the Association of Swiss Canton Fire Insurance Companies or
national fire safety regulations. The customer himself shall be responsible without exception for
ensuring that these regulations are complied with on site!
Содержание firematic CONDENSATION 30
Страница 1: ...OPERATING INSTRUCTIONS Wood chips pellets heating system firematic CONDENSATION 30 40 ...
Страница 17: ...Temperature manager 8 17 Fig 8 6 Example temperature manager when time mode without difference ...
Страница 83: ...Annex 15 83 15 ANNEX 15 1 Additional boiler module Hydraulic recommendation 1 ...
Страница 84: ...15 Annex 84 Hydraulic recommendation 2 ...
Страница 85: ...Annex 15 85 15 2 Solar module Program 1 ...
Страница 86: ...15 Annex 86 Program 2 ...
Страница 87: ...Annex 15 87 Program 3 ...
Страница 88: ...15 Annex 88 Program 4 ...
Страница 89: ...Annex 15 89 Program 5 ...
Страница 90: ...15 Annex 90 Program 6 ...
Страница 91: ...Notes 16 91 16 NOTES ...