HEROSE 0651X Скачать руководство пользователя страница 14

Operating instructions 

10

 

Phone  +49 4531 509-0 

M aintenance and service 

7.1 

Safety during cleaning 

Take note of  the specifications in the safety data sheet and the general occupational health and
saf ety rules if degreasers are used for process-related reasons for the cleaning of bearing parts,
f ittings and other precision parts.

7.2 

Maintenance 

The maintenance interv als must be defined by the user according to the operating conditions. 
The recommendations f or the functional checking of the diverter valves are to be taken f rom section 7.2.1 
"Inspection and maintenance intervals" in these operating instructions.  

7.2.1 

Inspection and maintenance intervals 

Recommended interv als 

Description 

Interval 

Scope 

Inspection 

During start-up

Visual inspection

  of  the div erter valve for damage:

  of  the marking f or legibility;

Leak-tightness

  at the gland packing;

  between body  I and body  II;

  of  the v alve seat;

  at the connections;

  at the plug screw;

Test the opening and closing f unctions of the
div erter v alve.

Functional testing 

annually

Test the opening and closing f unctions of the
div erter v alve including a visual inspection.

External inspection 

Ev ery  2 y ears

Check of  f unction and leak-tightness including visual
check.

Internal inspection 

Ev ery  5 y ears

Replacement of  all sealing elements, including a
f unction and leak test as well as a v isual inspection.

Hy draulic testing 

Ev ery  10 y ears

Replacement of  all sealing elements, including a
f unction and leak test as well as an inspection.

Содержание 0651X

Страница 1: ...HEROSE GMBH ARMATUREN UND METALLE Operating instructions Diverter valve 0651X 0652X 0653X...

Страница 2: ......

Страница 3: ...esloe Germany Phone 49 4531 509 0 Fax 49 4531 509 120 E mail info herose com Web www herose com 2nd issue 03 2020 The transmission or duplication ofthis documentand the use or communication ofits cont...

Страница 4: ...hone 49 4531 509 0 Table of contents 1 About these instructions 1 2 Safety 1 3 Transport and storage 4 4 Description of the diverter valve 4 5 Assembly 7 6 Operation 9 7 Maintenance and service 10 8 D...

Страница 5: ...ls used for the valve body and seals are resistant Contaminated media or usage outside of the pressure and temperature specifications can lead to damage to the v alv e body and seals Avoidance of fore...

Страница 6: ...of the diverter valve 2 7 Safety instructions DANGER Hazardous medium Escaping operating medium can lead to poisoning burns and caustic burns Wear the prescribed protectiv e equipment Prov ide suitab...

Страница 7: ...tion Protect spindle plastic parts and type plate against the application of paint Impermissible load Damage to the control mechanism Do not use the div erter v alve as a foothold Exceeding the maximu...

Страница 8: ...ng in damp storerooms to prevent the formation of condensation Adhere to a storage temperature range of 20 C to 65 C 4 Description of the diverter valve Ref er to the respective catalogue page f or fu...

Страница 9: ...of serv icing the safety valves or replacement of the bursting discs the side to be serviced is isolated f rom the tank In the end position one outlet is open and the other is closed It is not possib...

Страница 10: ...n this case a technical service life may be assumed in accordance with the underly ing product standards e g EN1626 f or shut off valves and EN ISO 4126 1 f or safety valves The technical serv ice lif...

Страница 11: ...Inspect the div erter valve for dirt and damage DO NOT install damaged or dirty div erter valves Remov e dirt and residues f rom the pipeline and div erter valve in order to prev ent leaks Av oid dama...

Страница 12: ...torque SV with copper washer in diverter valve Nm Tightening torque Rc Nm G thread NPT thread Rc thread Length cm min max min max min max 06510 06511 06512 06513 1 2 50 30 50 40 60 40 60 3 20 25 3 4 5...

Страница 13: ...uards are in place Compare the material pressure temperature and installation position with the lay out plan for the pipework sy stem Dirt and residues hav e been remov ed from the pipeline and div er...

Страница 14: ...ce intervals Recommended intervals Description Interval Scope Inspection During start up Visual inspection of the div erter valve for damage of the marking f or legibility Leak tightness at the gland...

Страница 15: ...tions cracked Replace the div erter v alve Body leaking Discontinuity gas cavity open Replace the div erter v alve Div erter v alve cannot be switched ov er Gland nut ov ertightened Loosen the gland n...

Страница 16: ...pressurised The medium and the div erter v alve must be at ambient temperature Aerate f lush the pipework sy stem in the case of corrosive and aggressive media 8 2 Disposal 1 Dismount the div erter va...

Отзывы: