HEROSE 0651X Скачать руководство пользователя страница 12

Operating instructions 

8

 

Phone  +49 4531 509-0 

Tightening torques  

D

iv

e

rt

e

v

a

lv

e

 

N

o

m

in

a

s

ize

 [

G

R

c

N

P

T

Tightening  torques (Nm) 

Number of 
layers of PTFE 
tape 

T

ig

h

te

n

in

g

 t

o

rq

u

e

 G

 [

N

m

T

ig

h

te

n

in

g

 t

o

rq

u

e

 N

P

T

 [

N

m

T

ig

h

te

n

in

g

 t

o

rq

u

e

 S

V

 w

it

h

 

d

o

u

b

le

 n

ip

p

le

 a

n

d

 c

la

m

p

in

g

 

s

le

e

v

e

 i

n

 d

iv

e

rt

e

v

a

lv

e

 [

N

m

T

ig

h

te

n

in

g

 t

o

rq

u

e

 S

V

 w

it

h

 

c

o

p

p

e

w

a

s

h

e

in

 d

iv

e

rt

e

v

a

lv

e

 [

N

m

T

ig

h

te

n

in

g

 t

o

rq

u

e

 R

c

 [

N

m

G

 t

h

re

a

d

 

N

P

T

 t

h

re

a

d

 

R

c

 t

h

re

a

d

 

L

e

n

g

th

 [

c

m

m

in

m

a

x

m

in

m

a

x

m

in

m

a

x

06510 / 
06511 / 
06512 / 
06513 

1/2 

50 

30 

50 

40 

60 

40 

60 

20-
25 

3/4 

50 

40 

60 

40 

70 

40 

70 

40-
45 

50 

50 

80 

50 

80 

50 

80 

55-
60 

1.1/4 

55 

50 

100 

50 

100 

50 

100 

80-
85 

1.1/2 

60 

70 

100 

60 

100 

60 

100 

90-
95 

06520/ 
06530 

1/2 

50 

30 

50 

30 

50 

40 

60 

20-
25 

06521/ 
06531 

3/4 

50 

40 

60 

40 

60 

40 

70 

40-
45 

Plug screw 
Test thread 

1/4 

20 

20 

20 

20 

20 

20 

20 

20 

10-
15 

1/2 

50 

Содержание 0651X

Страница 1: ...HEROSE GMBH ARMATUREN UND METALLE Operating instructions Diverter valve 0651X 0652X 0653X...

Страница 2: ......

Страница 3: ...esloe Germany Phone 49 4531 509 0 Fax 49 4531 509 120 E mail info herose com Web www herose com 2nd issue 03 2020 The transmission or duplication ofthis documentand the use or communication ofits cont...

Страница 4: ...hone 49 4531 509 0 Table of contents 1 About these instructions 1 2 Safety 1 3 Transport and storage 4 4 Description of the diverter valve 4 5 Assembly 7 6 Operation 9 7 Maintenance and service 10 8 D...

Страница 5: ...ls used for the valve body and seals are resistant Contaminated media or usage outside of the pressure and temperature specifications can lead to damage to the v alv e body and seals Avoidance of fore...

Страница 6: ...of the diverter valve 2 7 Safety instructions DANGER Hazardous medium Escaping operating medium can lead to poisoning burns and caustic burns Wear the prescribed protectiv e equipment Prov ide suitab...

Страница 7: ...tion Protect spindle plastic parts and type plate against the application of paint Impermissible load Damage to the control mechanism Do not use the div erter v alve as a foothold Exceeding the maximu...

Страница 8: ...ng in damp storerooms to prevent the formation of condensation Adhere to a storage temperature range of 20 C to 65 C 4 Description of the diverter valve Ref er to the respective catalogue page f or fu...

Страница 9: ...of serv icing the safety valves or replacement of the bursting discs the side to be serviced is isolated f rom the tank In the end position one outlet is open and the other is closed It is not possib...

Страница 10: ...n this case a technical service life may be assumed in accordance with the underly ing product standards e g EN1626 f or shut off valves and EN ISO 4126 1 f or safety valves The technical serv ice lif...

Страница 11: ...Inspect the div erter valve for dirt and damage DO NOT install damaged or dirty div erter valves Remov e dirt and residues f rom the pipeline and div erter valve in order to prev ent leaks Av oid dama...

Страница 12: ...torque SV with copper washer in diverter valve Nm Tightening torque Rc Nm G thread NPT thread Rc thread Length cm min max min max min max 06510 06511 06512 06513 1 2 50 30 50 40 60 40 60 3 20 25 3 4 5...

Страница 13: ...uards are in place Compare the material pressure temperature and installation position with the lay out plan for the pipework sy stem Dirt and residues hav e been remov ed from the pipeline and div er...

Страница 14: ...ce intervals Recommended intervals Description Interval Scope Inspection During start up Visual inspection of the div erter valve for damage of the marking f or legibility Leak tightness at the gland...

Страница 15: ...tions cracked Replace the div erter v alve Body leaking Discontinuity gas cavity open Replace the div erter v alve Div erter v alve cannot be switched ov er Gland nut ov ertightened Loosen the gland n...

Страница 16: ...pressurised The medium and the div erter v alve must be at ambient temperature Aerate f lush the pipework sy stem in the case of corrosive and aggressive media 8 2 Disposal 1 Dismount the div erter va...

Отзывы: