Installation
3 Hole Basin Mixer
1. Identify all components and check for completeness particularly before arranging fitting.
2. Disassemble the two side bodies and remove the T joint assembly(20) from the mixer body (03) then
feed the brass parts (labelled H & C) from the underside of the basin. Secure with shroud at the top (12)
and backnut and washers at bottom (13, 14, 15).
3. Remove spout backnut (19) & washer (18) before fitting the spout to the basin. Re-apply backnut and
washer to secure in to place.
4. Re-connect the ‘T’ joint and fit the two connecting pipes (17). Connect hot and cold water supplies.
5. Refit the handles (5-11) back on to the side bodies.
6. Fit the upper part of the pop up waste assembly (23) with washer above the basin. Fit the lower part of
the waste assembly underneath the basin It is recommended that a silicon sealant be applied to both
sealing faces of the two washers that sit against the basin. Ensure the threaded section on the body is
facing the wall at the rear, in order to accommodate the waste rod (22).
7. Connect the waste arm (22) to the underside of the waste assembly and attach the pop-up link (21).
Proceed to feed the operating knob (2) through the mixer body and ‘T’ joint and attach to the pop up
link (21).
8. The height of the plug can be adjusted by lengthening or shortening the screw on the under side of the
plug & locked by the nut on the screw. If the plug will not stay closed the friction of the pop up
mechanism can be increased by tightening the nut.
9. Fully open both valves, letting them run for a few minutes to check all joints & connections for leaks.
1.
Pop-Up Knob
x1
2.
Pop-Up Operating Rod
x1
3.
Mixer Body
x1
4.
Anti-Splash Assembly
x1
5.
Indice
x2
6.
Screw
x2
7.
Metal Washer
x2
8.
Handle
x2
9.
Shroud
x2
10.
Washer
x2
11.
Valve
x2
12.
Base Shroud
x2
13.
Shroud Seal
x3
14.
Washer
x3
15.
Backnut
x3
16.
Side Body
x2
17.
Connecting Pipe
x2
18.
Spout Washer
x1
19.
Spout Backnut
x1
20.
‘T’ joint
x1
21.
Pop-Up Link
x1
22.
Waste Rod
x1
23.
Waste Assembly
x1
07