A.  PRE-INSTALLATION NOTE

   

 It is recommended installa on prac ce to check the edge of the  
base into the wall by the width of the  ling flange in order to 
achieve a leak-free junc on with the wall cladding material (see 
diagram ‘A’)

B.  TIMBER FLOOR

  1.   Floor boards or sheet flooring must cover the en re underside of 

the base. Cut a hole for waste no greater than 200 x 200mm.
  

Note:

  If renova ng, ensure the floor is structurally sound.  

Replace the floor if necessary.

  2.  Spread a 10mm min. thick mortar bed of 4:1 Washed Sand: 

Cement over the area where base is to be installed then trowel 
off level.  Alterna vely spread a cement-based  le adhesive on 
the floor using a 12mm notched trowel.  
Ensure the total base area is fully supported.

Do not use silicone and/or liquid nails type adhesive to install 
base.

  3.   Lay the shower base on the prepared bed and use a spirit level to 

ensure the base is level both side to side and front to rear.  
This will allow the base to drain properly as it has an inbuilt fall to 
the waste outlet.

  4. 

At this point it is impera ve to check that water drains to the 
waste outlet prior to lining the shower walls.  Failure to do so is 
a breach of warranty.

 (see diagram ‘D’)

C.  CONCRETE SLAB

  1.   Any boxed opening in the slab to accommodate the waste must 

not exceed 300mm in width beneath the shower base.

  2.  Spread a 10mm min. thick mortar bed of 4:1 Washed Sand: 

Cement over the area where base is to be installed then trowel 
off level.  Alterna vely spread a cement-based  le adhesive on 
the floor using a 12mm notched trowel.
Ensure the total base area is fully supported.

Do not use silicone and/or liquid nails type adhesive to install 
base.

  3.   Lay the shower base on the prepared bed and use a spirit level to 

ensure the base is level both side to side and front to rear.  This 
will allow the base to drain properly as it has an inbuilt fall to the 
waste outlet.

  4. 

At this point it is impera ve to check that water drains to the 
waste outlet prior to lining the shower walls.  Failure to do so is 
a breach of warranty. 

(see diagram ‘D’)

  5.  Backfill the opening in the slab with a 4:1 Washed Sand: Cement 

mix ensuring the mortar is packed  ghtly around the waste outlet 
and all the way back into the boxed sec on of the slab and up to 
the underside of the base to give maximum support.

Note:

 Where required by regula on plas c pipe and fi ngs may 

need to be lagged prior to backfilling.

D.  SMARTPAN/SMARTWASTE

   

 When the installa on uses these products as the waste collectors 
keep the lid/cover on the fi ng to provide adequate support for 
the base.

Install base on mortar bed 
or cement-based tile 
adhesive

Test water drainage 
to waste

200mm max.

300 x 300mm max.

Smartpan/Smartwaste fitting - 
lid/cover must remain on 

Timber floor

Concrete slab

Villaboard or

water resistant

wall lining

Sealant

Tiles or wall

sheeting

Bottom

Plate

Mortar bed

Check-in base
as required

A

B

C

D

FLINDERS POLYMARBLE SHOWER BASE

INSTALLATION GUIDELINES

E