background image

21.85m(L)x13.85m(W)x6m(H) Star Marquee Instruction Manual       www.herculesgazebo.co.nz      [email protected]     0800 810 910

 

 

MARQUEE ASSEMBLY 

Spread out the marquee, and hook each marquee leg into place on top of each corresponding pegs. Ensure the hook on the leg sits between the 
two washes on the peg. From the same side of the marquee, insert the top of each pole to one of the soaking fitting. Ensure they are fully 
inserted.  

 

With at least one person holding each pole, walk towards the centre pushing up the marquee until both poles up vertical. Each pole must be 
inserted over and enter the relevant pole spigot base. Adjust both poles by turning the winder handles clockwise and right

 

up until the marquee is 

reasonable tight. If in windy, additional people may be needed to access to lift the one or two marquee legs off the pegs until both poles are 
being inserted in spigot bases. 

It is not recommended to assemble your marquee in extreme winds.

 

 

 
 
 

 

Содержание Double Peak Star Marquee

Страница 1: ...21 85m L x13 85m W x6m H Star Marquee Instruction Manual www herculesgazebo co nz info herculesgazebo co nz 0800 810 910 Double Peak Star Marquee 21 85m L x13 85m W x6m H INSTRUCTION MANUAL ...

Страница 2: ...a double peak star marquee Ensure area is free from any sharp overhead objects The star marquee can only be installed on grasses Do not assemble or use your marquee in very windy conditions Do not leave your marquee unattended Prolonged exposure to direct sunlight can cause colour fading Keep flame and heat sources away from the fabric to prevent damage Make sure that marquee other accessories are...

Страница 3: ...e weather conditions incorrect assembly dismantling improper storage or accidental damage Colour fading and UV breakdown of any fabric from exposure to sunlight is not covered by the manufacturer s warranty We advise you seek a private insurance to protect yourself against these possibilities Please check the contents of the boxes in advance of using your product for the first time we would recomm...

Страница 4: ...21 85m L x13 85m W x6m H Star Marquee Instruction Manual www herculesgazebo co nz info herculesgazebo co nz 0800 810 910 PACKAGE INCLUDES ...

Страница 5: ...21 85m L x13 85m W x6m H Star Marquee Instruction Manual www herculesgazebo co nz info herculesgazebo co nz 0800 810 910 TOOLS YOU WILL NEED ...

Страница 6: ...ar Marquee Instruction Manual www herculesgazebo co nz info herculesgazebo co nz 0800 810 910 LAY OUT PLAN SIZE LENGTH WIDTH HEIGHT L1 L2 L3 W1 W2 H1 H2 21 85mx13 85mx6m 5 85 13 85 21 85 8 13 85 2 1 6 Figure 01 Marquee dimensions ...

Страница 7: ... W x6m H Star Marquee Instruction Manual www herculesgazebo co nz info herculesgazebo co nz 0800 810 910 Set up a layout plan according to your marquee dimensions Figure 02 Layout plan steps of spigot and peg placement ...

Страница 8: ...spigot top by the hammer Using your spray marking paint and tap measure marking an 8m straight line using small dots on the ground either side of pole spigot bases also mark out the full length of the marquee Use the supplied triangle peg placement template mark out the position of each peg It s important that the template steps Figure 02 to follow to identify correct peg placement failed to follo...

Страница 9: ...s at this point swing the template over to the other side either the marquee keeping one side template on the original painted line lay the line on the ground through the blank template ring point H3 remove the spigot base and template replace the pole spigot base into the hole repeat these steps to other end of the marquee starting the other spigot base E2 All peg locations should now be identifi...

Страница 10: ...esgazebo co nz 0800 810 910 POLE ASSEMBLY To build the poles join section mark A B C and D And ensure the pole extension is fully closed on each process using the winder handle Place the assembled pole on the ground and repeat these steps to assemble the other pole Figure 03 pole assembly order ...

Страница 11: ... the soaking fitting Ensure they are fully inserted With at least one person holding each pole walk towards the centre pushing up the marquee until both poles up vertical Each pole must be inserted over and enter the relevant pole spigot base Adjust both poles by turning the winder handles clockwise and right up until the marquee is reasonable tight If in windy additional people may be needed to a...

Страница 12: ...both poles out of the spigot bases and walk the poles out of the marquee Remove all the pegs from the ground using the peg removal tools Pull apart both set of poles remove two spigot bases MARQUEE FODLING Fold the marquee in half and keep folding it two more times in the same direction Fold the marquee legs back into the marquee and fold the fabric again Finally place the marquee into the protect...

Отзывы: